Tender of “Construction of Viaduct Corridor from North End of Ranip Station to Dead End at Motera from chainage (+)12300.20 m to (+)17147.20 m (Excluding the Portions of Metro Rail Stations and transition span on both sides of Stations) on Package-4A of North-South Corridor for Ahmedabad Metro Rail Project Phase-1”, vide NIT No.: MEGA/CONS/VDCT/PKG-4A/N-S/2015
—
by