GMRC/Tender Notice/Insurance/2025 | Various Insurance Policies for the year 2025-26 | Gujarat Metro Rail Project | ICICI Lombard General Insurance Co Ltd | 29/03/2025 |
GMRC/O&M/C&H-01/PH-I/2024 | Mechanized Cleaning & Housekeeping Works of Ten (10) Nos. of Metro Stations in EW Corridor (Package-1) of Ahmedabad Metro Rail Project Phase – 1 | Ahmedabad Metro Rail Project Phase – 1 | M/s Godawari Farm & Services | 29/11/2024 |
GMRC/O&M/C&H-02/PH-I/2024 | “Mechanized Cleaning & Housekeeping Works of Eight (08) Nos. of Metro Stations in EW Corridor (Package-2) of Ahmedabad Metro Rail Project Phase – 1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. All Services Globle Private Limited | 29/11/2024 |
GMRC/O&M/C&H-03/PH-I/2024 | Mechanized Cleaning & Housekeeping Works of Six (06) Nos. of Metro Stations in NS Corridor (Package-3) of Ahmedabad Metro Rail Project Phase – 1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Hardik Construction Co. | 29/11/2024 |
GMRC/O&M/C&H-04/PH-I/2024 | Mechanized Cleaning & Housekeeping Works of Eight (08) Nos. of Metro Stations in NS Corridor (Package-4) of Ahmedabad Metro Rail Project Phase – 1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Komal Enterprise | 29/11/2024 |
GMRC/Consultant/Labour Law/2024 | Appointment of Labour Law Consultant for Gujarat Metro Rail Project | Gujarat Metro Rail Project | M/s S.K Jain & Associate | 24/11/2024 |
GMRC/SYSTEM/RFTP-03/PH-II/2024 | Feasibility study, Design, Engineering, Supply, Civil works, Procurement, Erection of suitable structure, Installation, Testing, Commissioning and Comprehensive Operation & Maintenance for 5 (five) years for 5 MW (indicative capacity) (AC) grid connected rooftop solar photovoltaic power project on rooftop of 15 nos. of Metro stations of Ahmedabad Metro Rail Project, Phase II of Gujarat Metro Rail Corporation (GMRC) Ltd | Ahmedabad Metro Rail Project Phase – 2 | M/s Trom Industries Limited | 24/10/2024 |
GMRC/O&M/CIVIL MAINTENANCE/UG/PH-1/2024 | General Civil Maintenance Work for Underground Metro Stations from Apparel Park Station Ramp to Shahpur Metro Station upto Shahpur Ramp ,including Under Tunnel Section & four (04) Metro Station Namely (Kankaria Station, Kalupur Railway Station, Gheekanta Station, & Shahpur Station) of Ahmedabad Metro Rail Project Phase-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Mishra Enterprise | 12/09/2024 |
GMRC/O&M/TRACK MAINTENANCE/NS/PH-1& PH-2/2024 | Track Maintenance Work of NS Corridor (APMC Station to Motera Station including Gyaspur Depot, Ramp and Pocket track) of Ahmedabad Metro Rail Project Phase-1 and (Motera Stations End to Mahatma Mandir Station, GNLU to Gift City Corridor including Indroda Park depot, Ramp, Pocket Track, Exit & Entry Lines and Dead Ends) Ahmedabad Metro Rail Project Phase-2 | Gujarat Metro Rail Project | M/s. Abhisaar Infrastructure Limited | 06/09/2024 |
GMRC/ADMIN/PRINTED STATIONERY/2024 | Providing Printed Stationery at GMRC Offices | Gujarat Metro Rail Project | M/s. Shree Ram Printers & Stationary | 05/09/2024 |
GMRC/O&M/C&H-01/PH-II/2024 | Mechanized Cleaning and Housekeeping works of Eight Metro Stations (i.e. GNLU, PDPU, Gift City, Raysan, Randesan, Dholakuva Circle, Infocity and Sector-1) for Ahmedabad Metro Rail Project Phase -II | Ahmedabad Metro Rail Project Phase – 2 | M/s. Het- Chint Hospitalities Pvt. Ltd. | 28/08/2024 |
GMRC/O&M/TRACK MAINTENANCE/EW/PH-1/2024, | Track Maintenance work of EW corridor (Thaltej Gam station to Vastral Gam Station with Dead Ends including Apparel Park Depot & Ramps) of Ahmedabad Metro Rail Project Phase-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Abhisaar Infrastructure Limited | 27/08/2024 |
GMRC/CIVIL MAINTENANCE/EW-1/PH-1/2024 | General civil maintenance work of EW R1 Corridor including Apparel Park depot, 6 stations and Viaduct from Apparel Park Ramp to Vastral Gam Dead End of Ahmedabad metro Rail Corporation Ltd Phase I | Ahmedabad Metro Rail Project Phase – 1 | M/s. Saumya Enterprise | 20/06/2024 |
GMRC/O&M/WIND TIES/PH-1/2024 | Supply & Installation of wind ties on roof sheet of platform, entry/exit structures, interchange gallery and concourse gallery on Stations of Ahmedabad Metro Rail Project Phase -1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Tanvi Engimech | 01/06/2024 |
GMRC/CAMC/STP-02/PH-1/2024 | OPERATION AND MAINTENANCE OF SEWAGE TREATMENT PLANT (STP) & EFFLUENT TREATMENT PLANT (ETP), GYASPUR DEPOT FOR AHMEDABAD METRO RAIL PROJECT – PHASE-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Enpro Enviro Tech and Engineers Pvt. Ltd. | 01/06/2024 |
GMRC/CIVIL MAINTENANCE/NS-4/PH-1/2024 | General Civil Maintenance of Viaduct N-S Corridor- 4 including 5 Stations (Ranip – Sabarmati Rly station, Sabarmati Rly station-AEC, AEC-Sabarmati, Sabarmati-Motera stadium , Motera Stadium -Dead End) of Gujarat Metro Rail Corporation Ltd Phase-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. K B Patel Procon Pvt. Ltd. | 08/05/2024 |
GMRC/DDC/METRO BHAWAN/AHMEDABAD/2023 | Detailed Design Consultancy Services for Construction of METRO Bhawan (Headquarter of GMRCL) at Indroda Depot, Gandhinagar for Gujarat Metro Rail Corporation Limited | Ahmedabad Metro Rail Project Phase – 1 | Consortium of M/s. Kamlesh Parekh Architects and M/s Ravi Ramparia Architects | 15/03/2024 |
GMRC/Road Repair & Maintenance Work/Surat/R/2023 | Repairs & Maintenance of Roads with ancillary works in connection with Surat Metro Rail Project, Phase-I | Surat Metro Rail Project Phase – 1 | M/s. Vibrant Construction Pvt. Ltd. | 13/03/2024 |
GMRC/PH-II/ICD/M&P/L1/2023/LOT-I | Design, Manufacture, Supply, Installation, Testing and Commissioning of Battery Powered Shunting Locomotive and Synchronized Mobile Jacks for Lifting Three Car Trains for Ahmedabad Metro Rail Project Phase-II | Ahmedabad Metro Rail Project Phase – 2 | M/s. Swastik Overseas | 11/03/2024 |
GMRC/CIVIL MAINTENANCE/NS-2/PH-1/2024 | General Civil Maintenance of Viaduct N-S Corridor- 2 including 6 Stations (Shreyas Transition Span – Paldi, Paldi – Gandhigram , Gandhigram- Old High Court, Old High Court- Usmanpura, Usmanpura – Vijay Nagar, Vijay Nagar – Vadaj, Vadaj – Ranip Transition Span) of Gujarat Metro Rail Corporation Ltd Phase-1. | Ahmedabad Metro Rail Project Phase – 1 | M/s. Harikrupa Construction Co. | 07/03/2024 |
GMRC/CAMC/STP/PH-1/2024 | OPERATION AND MAINTENANCE OF SEWAGE TREATMENT PLANT (STP) & EFFLUENT TREATMENT PLANT (ETP), APPAREL PARK DEPOT FOR AHMEDABAD METRO RAIL PROJECT – PHASE-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Enpro Enviro Tech and Engineers Pvt. Ltd. | 04/03/2024 |
GMRC/PH-II/ICD/M&P/L1/2023/LOT-II | Design, Manufacture, Supply, Installation, Testing and Commissioning of Synchronized Mobile Jacks for Lifting Three Car Trains for Ahmedabad Metro Rail Project Phase-II for LOT-II | Ahmedabad Metro Rail Project Phase – 2 | M/s. Swastik Overseas | 01/03/2024 |
GMRC/Horticulture/PH-2/2023 | “DEVELOPMENT OF GREENERY INCLUDING ITSMAINTENANCE AND FENCING WORKS OF AHMEDABADMETRO RAIL PROJECT, PHASE – II” | Ahmedabad Metro Rail Project Phase – 2 | M/s. Active Plantation | 23/02/2024 |
GMRC/CIVIL MAINTENANCE/EW-1/PH-1/2023 | “GENERAL CIVIL MAINTENANCE WORK OF VIADUCT (FROM SHAHPUR RAMP TOWARD STADIUM STATION UPTO THALTEJGAM STATION) & 7 STATIONS NAMELY (STADIUM STATION, COMMERCE SIX ROAD STATION, GUJARAT UNIVERSITYSTATION, GURUKUL ROAD STATION, DOORDARSHANKENDRA STATION, THALTEJ STATION AND THALTEJ GAMSTATION (EXCLUDING OLD HIGH COURT STATIONS) OFAHMEDABAD METRO RAIL CORPORATION LTD PHASE -1.” | Ahmedabad Metro Rail Project Phase – 1 | M/s. K.B. Patel Procon Pvt. Ltd. | 30/01/2024 |
GMRC/CAMC/Water purifier/2023 | CAMC (Comprehensive Annual Maintenance Contract) and Up gradation (wherever required) of Water Purifier in 29 stations of Phase-1 of Ahmedabad Metro for the period of 2 years | Ahmedabad Metro Rail Project Phase – 1 | M/s. Raindrops Water Technolodgies | 05/01/2024 |
GMRC/ADMIN/CAMC- AC/2023 | CAMC (Comprehensive Annual Maintenance Contract) for Split, Cassette Air conditioners and VRF Systems installed at GMRC Offices | Ahmedabad Metro Rail Project Phase – 1 | M/s. ENSOL | 30/12/2023 |
GMRC/ADMIN/TEA COFFEE/2023 | Supply of Tea/Coffee Raw Materials at GMRC Offices | Ahmedabad Metro Rail Project Phase – 1 | M/s. Eista Exim (OPC) Pvt ltd | 30/12/2023 |
GMRC/ADMIN/XEROX/2023 | Tender for Photocopy/Xerox & Related services at GMRC Offices | Ahmedabad Metro Rail Project Phase – 1 | M/s. Shree Gayatri Trading co. | 28/12/2023 |
GMRC/ENVIRONMENT/SURAT/N&V STUDY/2023 | Noise & Vibration Assessment study during Construction phase for Surat Metro Rail Project | Ahmedabad Metro Rail Project Phase – 1 | M/s. ND Dynamics | 13/12/2023 |
GMRC/O&M/C&H-04/2023 | HOUSEKEEPING OF GYASPUR DEPOT INCLUDING CLEANING ACTIVITIES OF COMPLETE DEPOT AREA (OFFICES AND SHEDS), PEST CONTROL,HORTICULTURE AND OFFICE MANAGEMENT FOR AHMEDABAD METRO RAIL PROJECT – PHASE-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Hardik Construction Company | 02/12/2023 |
GMRC/CIVIL MAINTENANCE/NS/PH-1/2023 | GENERAL MAINTENANCE CIVIL WORK FOR 4.776 KM OF NS CORRIDOR INCLUDING GYASPUR DEPOT, 4 STATIONS & VIADUCT OF AHMEDABAD METRO RAIL PROJECT PHASE-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Mishra Enterprise | 01/12/2023 |
GMRC/DEPOT/MP-L8/2023 | Design, Manufacture, Supply, Installation, Testing and Commissioning of Driving Cab Simulator | Ahmedabad Metro Rail Project Phase – 1 | M/s Consortium of Logos-ATPL-Renmakch | 10/11/2023 |
GMRC/O&M/PRINTING & OTHER RELATED WORKS/2023 | Providing printing, Photocopy (Xerox) & Related works for O&M wing of GMRC | Ahmedabad Metro Rail Project Phase – 1 | M/s. Best Computer and Printing | 04/11/2023 |
GMRC/DCD&BD/MP-L5/2023 | Design, Manufacture, Supply, Installation Testing and Commissioning of Fully Automatic Train Wash Plant & Blow Down Plant for Surat Metro Rail Project and Blow Down Plant for Ahmedabad Metro Rail Project Phase-I | Ahmedabad Metro Rail Project Phase – 1 | M/s. Gourika India Limited | 30/10/2023 |
GMRC/SYSTEM/RFTP-02(R2)/DEPOT/EW-NS/2023 | Design, Engineering, Supply & Procurement, Erection, Testing, Commissioning and Comprehensive Operation & Maintenance for 5 (five) years for 406 kw (ac) grid connected rooftop solar photovoltaic power project on rooftop of various buildings at two locations (i) Site 1- Apparel Park depot (206 kw) and (ii) Site 2- Gyaspur depot (200 kw) of Gujarat Metro Rail Corporation (GMRC) Ltd, Gujarat | Ahmedabad Metro Rail Project Phase – 1 | M/s. RE360 | 10/10/2023 |
GMRC/S&T/SIG-02 | DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF SIGNALLING AND TRAIN CONTROL SYSTEMS FOR SURAT METRO RAIL PHASE-I PROJECT | Surat Metro Rail Project Phase – 1 | Consortium of Alstom Transport India Limited and Alstom Transport SA | 31/08/2023 |
GMRC/S&T/SIG-03 | Design, Manufacture, Supply, Installation, Testing and Commissioning of Signaling and Train Control System for Ahmedabad Metro Rail Project Phase-II | Ahmedabad Metro Rail Project Phase – 2 | Consortium of Nippon Signal and Nippon Signal India | 31/08/2023 |
GMRC/RS3 | Design, Manufacture, Supply, Testing, Commissioning and Training of 30 nos. of Standard Gauge Cars for Ahmedabad Metro Rail Phase-II Project | Ahmedabad Metro Rail Project Phase – 2 | M/s. Titagarh Wagons Limited | 29/08/2023 |
GMRC/DCD&BD/MP-L7/2023 | Design, Manufacture, Supply, Testing and Commissioning of Two No. of Standard Gauge Wagons (Well Type), Carrying Capacity – 30 T for Surat Metro Rail Project | Surat Metro Rail Project Phase – 1 | M/s. Gourika India Limited | 23/08/2023 |
GMRC/S&T/PSD-02 | Design, Manufacture, Supply, Installation, Integration, Testing and Commissioning of Platform Screen Doors System for Surat Metro Rail Phase-I Project | Surat Metro Rail Project Phase – 1 | Consortium of CRRCTEC – OMEGA | 08/08/2023 |
GMRC/S&T/TEL-03 | “Design, Manufacture, Supply, Installation, Testing and Commissioning of Telecommunication System for Ahmedabad Metro Rail Project Phase-II.” | Ahmedabad Metro Rail Project Phase – 2 | M/s. Larsen & Toubro Limited | 10/07/2023 |
GMRC/RS2 | Design, Manufacture, Supply, Testing, Commissioning and Training of 72 nos. of Standard Gauge Cars for Surat Metro Rail Phase-I Project I | Surat Metro Rail Project Phase – 1 | M/s. Titagarh Wagons Limited | 27/06/2023 |
GMRC/E&M Annual Rate Contract/PH-1/2022 | Annual Rate Contract for E&M works at 22 Elevated stations of Phase-1 and Gyaspur depot of NS Corridor for Gujarat Metro Rail Corporation Ltd. | Ahmedabad Metro Rail Project Phase – 1 | M/s. Adhishwaram Corporation | 16/06/2023 |
GMRC/HH RAIL/TRANSPORTATION/PH-1&2/2023 | TENDER FOR LOADING, UNLOADING, TRANSPORTATION AND STACKING OF UIC -60/60 E1, 1080 GRADE HH RAIL (18 M LONG) FROM MANUFACTURER’S PLANT TO AHMEDABAD / GANDHINAGAR DEPOT AND SURAT DEPOT OF GUJARAT METRO RAIL CORPORATION LIMITED | Gujarat Metro Rail Project | M/s. Prism Logistics Pvt Ltd | 23/05/2023 |
GMRC/ADMIN/STATIONERY ITEMS/2023 | Tender for Supply of Stationery items at GMRC Offices | Gujarat Metro Rail Project | M/s Final office and home Solutions Pvt Ltd. | 10/05/2023 |
GMRC/SURAT/UG/E&M-01 | Detail Design, Manufacture, Supply, Installation, Testing & Commissioning of Electrical and Mechanical (E&M) system including fire, hydraulic system and DG set, Environment Control System (ECS), Tunnel Ventilation System (TVS), TVS-SCADA and Building Management System (BMS) works for six (06) Underground Stations and associated Tunnels of Surat Metro Rail Project Phase-I | Surat Metro Rail Project Phase – 1 | Consortium of ETA & Polycab | 03/05/2023 |
GMRC/O&M/TRACK MAINTENANCE/NS(R)/PH-1/2023 | TRACK MAINTENANCE WORK OF NS REACH-1 (SHREYAS METRO STATION TO GYASPUR DEPOT RAMP AND GYASPUR DEPOT) OF AHMEDABAD METRO RAIL PROJECT PHASE-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s Abhisaar Infrastructure Pvt. Ltd | 28/04/2023 |
GMRC/Civil Maintenance/EW/PH-1/2023 | General Civil Maintenance Work of E/W R1 Corridor including Apparel Park Depot, 6 Stations & Viaduct from Apparel Park Ramp Depot to Vastral Gam Dead End of Ahmedabad Metro Rail Corporation Ltd Phase -1. | Ahmedabad Metro Rail Project Phase – 1 | M/s Saumya Enterprise | 27/04/2023 |
GMRC/O&M/TRACTION/AMC/PH-I/2022 | Traction maintenance activities for 132KV switchyard & 33KV Auxiliary Sub-Stations and manning of 132kV Receiving Sub-Stations of Phase- I for Gujarat Metro Rail Corporation Ltd | Ahmedabad Metro Rail O&M Phase – 1 | M/s Rajesh Power Services Pvt. Ltd. | 26/04/2023 |
GeM Bid No. GEM/2023/B/3250512 | Tender for Hiring of Vehicles on Monthly Basis for Operation and Maintenance department of GMRC | Ahmedabad Metro Rail Project Phase – 1 | M/s. Karni Roadways Pvt. Ltd. | 20/04/2023 |
GMRC/SURAT/FACILITY MANAGEMENT & SECURITY SERVICES/2023 | Tender for Providing Facility Management, housekeeping services including housekeeping materials and Security Services for Surat Office of GMRC | Surat Metro Rail Project Phase – 1 | M/s Disha Security Agency | 15/04/2023 |
GMRC/E&M/CAMC DG/PH-1/2022 | Comprehensive Annual Maintenance Contract of DG Set (B-Check) installed at 26 Elevated stations of Phase-1 and Apparel Park Depot, Gyaspur depot for Gujarat Metro Rail Corporation Ltd | Ahmedabad Metro Rail Project Phase – 1 | M/s Sanskar Engineers | 11/04/2023 |
GMRC / S&T / TEL – 02 | DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TELECOMMUNICATION SYSTEMS FOR SURAT METRO RAIL PROJECT PHASE – I | Surat Metro Rail Project Phase – 1 | M/s. HFCL Limited | 28/03/2023 |
GMRCL/TR/ST/EP-1/2022 | SUPPLY, ERECTION, TESTING AND COMMISSIONING OF POWER SUPPLY RECEIVING & DISTRIBUTION SYSTEM, 750 V DC THIRD RAIL TRACTION ELECTRIFICATION AND SCADA SYSTEM FOR SURAT METRO RAIL PROJECT PHASE-I | Surat Metro Rail Project Phase – 1 | Consortium of SIEMENS & Rail Vikas Nigam Ltd | 24/03/2023 |
GMRC/L&E/2 | Design, Manufacture, Supply, Installation, Testing and Commissioning of Machine Room-Less & Gear-Less Lifts (Lot-1) for Surat Metro Rail Phase-I Project. | Surat Metro Rail Project Phase – 1 | M/s. OMEGA Elevators | 13/03/2023 |
GMRC/L&E/2 | Design, Manufacture, Supply, Installation, Testing and Commissioning of Heavy Duty Escalators (Lot-2) for Surat Metro Rail Phase-I Project | Surat Metro Rail Project Phase – 1 | Consortium of M/s. OMEGA Elevators and Canny Elevator Company Limited | 13/03/2023 |
GMRC/Track-2/Surat/Ph-1/2022 | Design, Supply, Installation, Testing and Commissioning of Ballastless Track from Bhesan to Saroli in Elevated Section Including Connecting Lines to Depot along with Ballasted / Ballastless/ Embedded Standard Gauge Track For Corridor-II, Surat Metro Rail Project, Phase 1 | Surat Metro Rail Project Phase – 1 | M/s. Rahee Infratech Limited | 09/03/2023 |
GMRCL/TR/AMD/EP-2 /2022 | SUPPLY, ERECTION, TESTING AND COMMISSIONING OF POWER SUPPLY RECEIVING & DISTRIBUTION SYSTEM, 750 V DC THIRD RAIL TRACTION ELECTRIFICATION AND SCADA SYSTEM FOR AHMEDABAD METRO RAIL PROJECT PHASE-II” | Ahmedabad Metro Rail Project Phase – 2 | Consortium of SIEMENS & Rail Vikas Nigam Ltd | 06/03/2023 |
GMRC/FEASIBILITY STUDY/SURAT/2022 | Engagement of Consultancy Services for Undertaking Financial Feasibility Study and Bid Process Management for Commercial Development of Land Parcels Under PPP Development for Surat Metro Rail Project Phase-I | Surat Metro Rail Project Phase – 1 | M/s. Almondz Global Infra Consultants Ltd. | 15/02/2023 |
GMRC/O&M/CIVIL MAINTENANCE/UG/PH-1/2022 | GENERAL CIVIL MAINTENANCE WORK FOR UNDERGROUND METRO STATIONS FROM APPAREL PARK STATION RAMP TO SHAHPUR METRO STATION UPTO OLD HIGHCOURT STATION TRANSITION SPAN, INCLUDING UNDER TUNNEL SECTION & FOUR (04) METRO STATION NAMELY (KANKARIA STATION, KALUPUR RAILWAY STATION, GHEEKANTA STATION, & SHAHPUR STATION) OF AHMEDABAD METRO RAIL PROJECT PHASE-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Saumya Enterprise | 13/02/2023 |
GMRC/CIVIL MAINTENANCE/NS-2/PH-1/2022 | GENERAL CIVIL MAINTENANCE OF VIADUCT N-S CORRIDOR- 2 INCLUDING 6 STATIONS (SHREYAS TRANSITION SPAN – PALDI, PALDI – GANDHIGRAM, GANDHIGRAM- OLD HIGH COURT, OLD HIGH COURT- USMANPURA, USMANPURA – VIJAY NAGAR, VIJAY NAGAR – VADAJ, VADAJ – RANIP TRANSITION SPAN) OF GUJARAT METRO RAIL CORPORATION LTD PHASE-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s Mishra Enterprise | 09/02/2023 |
GMRC/CIVIL MAINTENANCE/NS-4/PH-1/2022 | GENERAL MAINTENANCE CIVIL WORK OF RANIP –AEC, AEC- SABARMATI, SABARMATI – MOTERA STADIUM, MOTERA STADIUM – DEAD END FOR N-S CORRIDOR OF AHMEDABAD METRO RAIL PROJECT PHASE-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s K.B Patel Procon Private Limited | 09/02/2023 |
GMRC/L&E/3 | DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF MACHINE ROOM-LESS & GEAR-LESS LIFTS (LOT-1) AND HEAVY-DUTY ESCALATORS (LOT-2) FOR AHMEDABAD METRO RAIL PHASE-II PROJECT | Ahmedabad Metro Rail Project Phase – 2 | M/s. OMEGA Elevators | 04/02/2023 |
GMRC/HH Rail/Ahmedabad/Ph-2/2022 | Supply of 9116 MT UIC 60/60E1, 1080 Head Hardened Grade Rails as per the specifications for Ahmedabad Metro Rail Project Phase-II | Ahmedabad Metro Rail Project Phase – 2 | M/s. Jindal Steel and Power Limited | 04/02/2023 |
GMRC/R260 Rail/Surat/Ph-1/2022 | Supply of 3600 MT UIC 60/60E1, R260 Grade Rails as per the specifications for Surat Metro Rail Project Phase-I | Surat Metro Rail Project Phase – 1 | M/s. Jindal Steel & Power Limited | 04/02/2023 |
GMRC/DCD&BD/MP-L3R/2022 | Design, Manufacture, Supply, Installation, Testing and Commissioning of two numbers each of Electric Bogie Tractors, Electric Shunter and Battery Powered Shunting Locomotive for Surat Metro Rail Project” as Lot I and Lot II | Surat Metro Rail Project Phase – 1 | M/s. Renmackch India Pvt. Ltd. (Lot-1) & M/s. Swastik Overseas (Lot-2) | 02/02/2023 |
GMRC/SYSTEM/SURAT/STNS/PKG – EM 02/PH-1/2022 | Supply, Installation, Testing and Commissioning of E&M Works for 20 Elevated Stations – Sarthana, Nature Park, Varcha Chopati Garden and Shri Swaminarayan Mandir Kalakunj on Corridor – 1 and Bhesan, Botanical Garden, Ugat Vaarigruh, Palanpur Road, L.P.Swani School, Performing Art Centre, Adajan Gam, Badri Narayan Temple, Majura Gate, Udhana Darwaja, Kamela Darwaja, Anjana Farm, Model Town, Magob, Bharat Cancer Hospital and Saroli on Corridor-2, In Connection With Surat Metro Rail Project, Phase-1, Package EM – 02 | Surat Metro Rail Project Phase – 1 | M/s. V.K Building Services | 31/01/2023 |
GMRCL/ Turnouts /Surat/Ph-1/2022 | Design and Supply of UIC 60/60E1 Turnouts for Track work of Surat Metro Rail Project Phase-1 | Surat Metro Rail Project Phase – 1 | M/s. Vossloh Cogifer S.A | 13/01/2023 |
GMRC/HH Rail/Surat/Ph-1/2022 | Supply of 13092 MT UIC 60/60E1, 1080 Head Hardened Grade Rails as per the specifications for Surat Metro Rail Project Phase-I | Surat Metro Rail Project Phase – 1 | M/s. Jindal Steel & Power Limited | 13/01/2023 |
GMRC/SYSTEM/SURAT/STNS/PKG-EM03/PH-1/2022 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF E & M WORKS FOR 02 NOS. ELEVATED STATIONS- AQUARIUM AND ATHWA CHOPATI ON CORRIDOR-2, IN CONNECTION WITH SURAT METRO RAIL, PHASE-1 PACKAGE EM-03 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Adhishwaram Corporation | 07/01/2023 |
GMRC/SYSTEM/SURAT/STNS/PKG-EM 03/PH-1/2022 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF E & M WORKS FOR 02 NOS. ELEVATED STATIONS- AQUARIUM AND ATHWA CHOPATI ON CORRIDOR-2, IN CONNECTION WITH SURAT METRO RAIL, PHASE-1 PACKAGE EM-03 | Surat Metro Rail Project Phase – 1 | M/s. Adhishwaram Corporation | 07/01/2023 |
GMRC/O&M/TRACK MAINTENANCE/NS-2/PH-1/2022 | TRACK MAINTENANCE WORK OF NOTRH SOUTH CORRIDOR (SHREYAS METRO STATION TO MOTERA STADIUM) OF AHMEDABAD METRO RAIL PROJECT PHASE-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s Abhisaar Infrastructure Pvt. Ltd | 05/01/2023 |
GMRC/Track-1/Surat/Ph-1/2022 | Design, Supply, Installation, Testing and Commissioning of Ballastless Track from Sarthana to Dream City in Elevated and Underground Sections Including Connecting Lines to Depot along with Ballasted / Ballastless / Embedded Standard Gauge Track For Corridor-I, Surat Metro Rail | Surat Metro Rail Project Phase – 1 | M/s RVNL-ISC JV | 04/01/2023 |
GMRC/ADMIN/SECURITY SERVICES/2022 | TENDER FOR PROVIDING SECURITY SERVICES FOR PROJECT OFFICES AND SITES OF GMRC | Ahmedabad Metro Rail Project Phase – 1 | M/s Eagle Security & Personal Services | 02/01/2023 |
GMRC/E&M/CAMC UPS /PH-1/2022 | Comprehensive Annual Maintenance Contract of UPS System installed at Elevated stations and Depot of phase-1 of Gujarat Metro Rail Corporation Ltd | Ahmedabad Metro Rail Project Phase – 1 | M/s. Power Tech Services | 02/01/2023 |
GEM/2022/B/2796155 | Tender for Hiring of vehicles on monthly basis for GMRC Officials | Gujarat Metro Rail Project | M/s. Rajan Travells | 29/12/2022 |
GMRC/ADMIN/FACILITY MANAGEMENT/2022 | Facility Management, especially for providing manpower for GMRC offices and housekeeping services including housekeeping materials | Ahmedabad Metro Rail Project Phase – 1 | M/s Green Globe Solution | 21/12/2022 |
GMRC/S&T/AFC-02/SURAT/PH-1/R/2022 | REQUEST FOR PROPOSAL FOR DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING, MAINTENANCE OF NCMC EMV BASED AUTOMATIC FARE COLLECTION SYSTEM BASED ON PPP REVENUE MODEL | Ahmedabad Metro Rail Project Phase – 1 | M/s. Airtel Payments Bank Limited | 20/12/2022 |
GMRC/CONS/DC 02/SURAT/PH-1/2022 | CONSTRUCTION OF BHESAN DEPOT CUM WORKSHOP WHICH INCLUDES DCC, BCC AND ASSOCIATED E&M WORKSUNDER CORRIDOR – C2, BHESAN TO SAROLI, FOR SURAT METRO RAIL PROJECT PHASE – 1, DC-2 | Surat Metro Rail Project Phase – 1 | M/s. Rail Vikas Nigam Ltd. | 20/12/2022 |
GMRC/R260 Rail/Ahmedabad/PH-II/2022 | Supply of 788 MT UIC 60/60E1, R260 Grade Rails, conforming to RDSO’s specification IRST-12-2009, for Ahmedabad Metro Rail Project Phase-II | Ahmedabad Metro Rail Project Phase – 1 | M/s. Jindal Steel and Power Limited | 03/12/2022 |
GMRCL/Turnouts/Ahmedabad/Ph-2/2022 | Design and Supply of UIC 60/60E1 Turnouts for Track work of Ahmedabad Metro Rail Project Phase-II | Ahmedabad Metro Rail Project Phase – 2 | M/s. VOESTALPINE VAE VKN INDIA PVT. LTD. | 03/12/2022 |
GMRC/O&M/CFS-01(R)/2022 | CUSTOMER FACILITATION SERVICES AT METRO STATIONS OF AHMEDABAD METRO RAIL PROJECT PHASE-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s Outsourcing Solutions | 21/11/2022 |
GMRC/CONS/VDCT+STNS/PKG-C3/PH-2/2022 | Construction of 7.553 kms elevated viaduct and 7 nos. of stations (incl. E&M, Architectural Finishing, Roofing, Plumbing, Signage, etc.) from Sector-1 to Mahatma Mandir (ch. 31945.443m to 39498.302m, Package C3) in connection with Ahmedabad Metro Rail Project, Phase-2 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Dilip Buildcon Limited | 20/10/2022 |
GMRC/GD & AD/MP-L13/2022 | Design, Manufacture, Supply, Installation, Testing and Commissioning of One no. of Hydraulic Wheel Press DC (double cylinder) for Ahmedabad Metro Rail Project Phase-I | Ahmedabad Metro Rail Project Phase – 1 | M/s A.D. ELECTRO STEEL CO. PVT. LTD | 18/10/2022 |
GMRC/DCD&BD/MP-L4R/2022 | Design, Manufacture/Assembly, Supply, Testing and Commissioning of Two Sets Each of Rail cum Road Vehicle and Re-railing and Rescue Equipment for Surat Metro Rail Project | Surat Metro Rail Project Phase – 1 | M/s. Gourika India Ltd. (Lot-1) & M/s. A D Electro-Steel Co. Pvt. Ltd. (Lot-2) | 17/10/2022 |
GMRC/Track/Ahmedabad/PH-II/2022 | Design, Supply, Installation, Testing and Commissioning of Ballastless track from Motera to Mahatma Mandir and GNLU to GIFT City in elevated section including connecting lines to Depot along with ballasted/ ballastless / embedded standard gauge track, Ahmedabad Metro Rail Project, Phase II | Ahmedabad Metro Rail Project Phase – 2 | M/s. VNC-KEC-EMRAIL JV | 17/10/2022 |
GMRC/CONS/VDCT+STNS/PKG-CS6/PH-1/2022 | Construction of 8.702 kms elevated viaduct and 7 nos. stations (Excl. E&M, Architectural Finishing and Roofing) from Majura Gate (Ch. 9090 m) to Saroli Dead End (Ch. 17791.851 m) under Corridor-2 in connection with Surat Metro Rail Project Phase – 1 | Surat Metro Rail Project Phase – 1 | M/s. Dilip Buildcon Ltd. | 15/10/2022 |
GMRC/O&M/SECURITY SERVICES/N-S/Part 2(R)/PH-1/2022 | PROVIDING SECURITY SERVICES/MANPOWER FOR NORTH-SOUTH CORRIDOR STATIONS (9 stations) OF PHASE-1 OF GMRC | Ahmedabad Metro Rail Project Phase – 1 | M/s National Security Services | 14/10/2022 |
GMRC/O&M/SECURITY SERVICES/E-W/Part 2(R)/PH-1/2022 | PROVIDING SECURITY SERVICES/MANPOWER FOR EAST-WEST CORRIDOR STATIONS (9 stations) OF PHASE-1 OF GMRC | Ahmedabad Metro Rail Project Phase – 1 | 1.M/s Kutch Security Services 2.M/s Shiv Security Services 3. M/s Group 7 Guards (India) Pvt Ltd | 14/10/2022 |
GMRC/O&M/SECURITY SERVICES/N-S/Part 1(R)/PH-1/2022 | PROVIDING SECURITY SERVICES/MANPOWER FOR NORTH-SOUTH CORRIDOR STATIONS (7 stations) & GYASPUR DEPOT OF PHASE-1 OF GMRC | Ahmedabad Metro Rail Project Phase – 1 | M/s Eagle Security & personal Services | 14/10/2022 |
GMRC/O&M/SECURITY SERVICES/E-W/Part 1(R)/PH- 1/2022 | PROVIDING SECURITY SERVICES/MANPOWER FOR EAST-WEST CORRIDOR STATIONS (7 stations) & APPARELPARK DEPOT OF PHASE-1 OF GMRC | Ahmedabad Metro Rail Project Phase – 1 | M/s Newgen Industrial Security (GUJ) Pvt Ltd | 14/10/2022 |
GMRC/O&M/SECURITY SERVICES/N-S/Part 2(R)/PH-1/2022 | PROVIDING SECURITY SERVICES/MANPOWER FOR NORTH-SOUTH CORRIDOR STATIONS (9 stations) OF PHASE-1 OF GMRC | Ahmedabad Metro Rail Project Phase – 1 | M/s National Security Services | 14/10/2022 |
GMRC/O&M/Train Cleaning/Ph-1/2022 | Train Cleaning at Apparel Park and Gyaspur Depot for Ahmedabad Metro Rail Project Phase -1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Green Globe Solutions | 14/10/2022 |
GMRC/CIVIL MAINTENANCE/EW/PH-1/2022 | GENERAL CIVIL MAINTENANCE WORK OF WESTERN REACH FROM TRANSITION SPAN (VIADUCT) OF OLD HIGH COURT TOWARDS STADIUM STATION UPTO THALTEJ GAM DEAD END (7 STATIONS AND VIADUCT) OF AHMEDABAD METRO RAIL PROJECT PHASE-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. K.B. Patel Procon Pvt. Ltd. | 06/10/2022 |
GMRC/CONS/VDCT+STNS/PKG-CS4/PH-1/2022 | Construction of 4.15 km (ch. -450 to ch. 3700) elevated viaduct dead end of Sarthana station to end of UG ramp including 4 stations (Excl. E&M, Architectural finishing and Roofing) for Surat Metro Rail Project Phase – 1, Corridor-1 | Surat Metro Rail Project Phase – 1 | M/s. Ranjit Buildcon Limited | 01/10/2022 |
GMRC/ARCH/STNS/CA-2/PH-1/2022 | ARCHITECTURAL FINISHING, STRUCTURAL STEEL ROOFING, SIGNAGES AND PHE WORKS FOR 11 NOS. OF ELEVATED STATIONS FROM BHESAN STATION TO MAJURA GATE STATION OF CORRIDOR –II, SURAT METRO RAIL PROJECT, PHASE -1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. D.H. Patel Engineers & Contractor | 06/09/2022 |
GMRC/ARCH/STNS/CA-3/PH-1/2022 | ARCHITECTURAL FINISHING, STRUCTURAL STEEL ROOFING, SIGNAGES, AND PHE WORKS OF ELEVATED METRO-RAIL STATIONS – (TOTAL 11 NOS) – 4 NOS OF STATIONS AT CORRIDOR-1 FROM ELEVATED VIADUCT DEAD END OF SARTHANA STATION TO END OF UG RAMP AND 7 NOS OF STATIONS AT CORRIDOR-2 FROM END OF MAJURA GATE STATION TO DEAD END OF SAROLI STATION UNDER SURAT METRO RAIL PROJECT, PHASE -1 | Surat Metro Rail Project Phase – 1 | M/s. LCC Projects Pvt. Ltd. – SCC Infrastructure Pvt. Ltd. (JV) | 06/09/2022 |
GMRC/GEC/AHMEDABAD-PH-II/2021 | Pre-Qualification (EOI) and Request for Proposal (RFP) for Selection of General Engineering Consultants for Ahmedabad Metro Rail Project – Phase – II | Ahmedabad Metro Rail Project Phase – 2 | M/S. RITES – CONSORTIUM WITH NIPPON KOEI CO. LTD., AARVEE ASSOCIATES ARCHITECTS ENGINEER & CONSULTANTS PVT. LTD | 05/09/2022 |
GMRC/O&M/C&H/UG- 4STNS/2022 | Mechanized Cleaning and Housekeeping works of Kankaria East, Kalupur Railway station, Gheekanta, Shahpur Stations for Ahmedabad Metro Rail Project Phase -1 | Ahmedabad Metro Rail Project Phase – 1 | M/s Komal Enterprise | 30/08/2022 |
GMRC/O&M/ C&H/NS- 6STNS./2022 | Mechanized Cleaning and Housekeeping works of Vadaj, Ranip, Sabarmati Rly. Stn, AEC, Sabarmati, Motera Stadium Stations for Ahmedabad Metro Rail Project Phase -1 | Ahmedabad Metro Rail Project Phase – 1 | M/s Komal Enterprise | 23/08/2022 |
GMRC/O&M/C&H/NS- 5 STNS/2022 | Mechanized Cleaning and Housekeeping works of Paldi, Gandhigram, Old High Court, Usmanpura, Vijay Nagar Stations for Ahmedabad Metro Rail Project Phase -1 | Ahmedabad Metro Rail Project Phase – 1 | M/s Komal Enterprise | 20/08/2022 |
GMRC/O&M/SECURITY SERVICES/E-W/Part 2/PH-1/2022 | EXECUTION OF SUNDRY ITEMS OF VIADUCT, & STATION OF EW/PKG REACH-2, AHMEDABAD METRO RAIL, PHASE-I | Ahmedabad Metro Rail Project Phase – 1 | M/s Harikrupa Construction Co. | 12/08/2022 |
GMRC/O&M/C&H/WESTERN REACH- 7STNS/2022 | Mechanized Cleaning and Housekeeping works of Stadium,Commerce Six Road,Gujarat University, Gurukul Road, Doordarshan Kendra, Thaltej, Thaltej Gam Stations for Ahmedabad Metro Rail Project Phase -1 | Ahmedabad Metro Rail Project Phase – 1 | M/s Komal Enterprise | 12/08/2022 |
GMRC/CAMC HVAC WORKS/PH-1/2022 | Comprehensive Annual Maintenance Contract of Variable Refrigerant Flow (VRF) System & split AC Unit installed at 22 Elevated stations of phase-1 and Gyaspur Depot of NS Corridor of Gujarat Metro Rail Corporation Ltd. | Ahmedabad Metro Rail Project Phase – 1 | M/s Pranam HVAC Engineering Ltd. | 28/07/2022 |
GMRC/NS/PKG-4A & 4B /SUNDRY ITEMS/2022 | EXECUTION OF SUNDRY ITEMS OF VIADUCT, & STATION OF NS/PKG 4A & 4B, AHMEDABAD METRO RAIL, PHASE-I | Ahmedabad Metro Rail Project Phase – 1 | M/s. Vibrant Construction Pvt. Ltd. | 22/07/2022 |
GMRC/CAMC FAS Works/PH-1/2022 | Comprehensive Annual Maintenance Contract of Fire alarm System, Inergen Gas and Gas Flooding System installed at 22 Elevated stations of Phase-1 and Gyaspur depot of NS Corridor for Gujarat Metro Rail Corporation Ltd. | Ahmedabad Metro Rail Project Phase – 1 | M/s. Raucous Automation LLP | 15/07/2022 |
GMRC/CAMC E&M FAS /EW-1/PH-1/2021 | Comprehensive Annual Maintenance Contract of Fire alarm System, Inergen Gas & Gas flooding System installed at Apparel Park Depot and 4 Elevated stations of E-W-1 Corridor of Phase-1 for Gujarat Metro Rail Corporation Ltd. | Ahmedabad Metro Rail Project Phase – 1 | Consortium of M/s Raucous Automation LLP and Adishwaram Corporation | 15/07/2022 |
GMRC/RS MAINTENANCE SERVICES/ PH-1/2022 | Providing maintenance services of Rolling Stock for GMRC, Phase-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. ASA Bhanu Technical Services Limited | 07/07/2022 |
GMRC/AMC/ AFC-SYSYTEM/PH-1/2022 | Annual Maintenance Contract of AFC System installed at 33 stations of Gujarat Metro Rail Project Phase -1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. eVenture Softsol Private Ltd. | 23/06/2022 |
GMRC/IT/Printer/2022/01 | Supply of A4 & A3 Multifunction Printer | Ahmedabad Metro Rail Project Phase – 1 | Foto Flux Systems Pvt. Ltd. | 10/06/2022 |
GMRC/ARCH/STNS/PH-2/2021 | ARCHITECTURAL FINISHING, ROOFING, PLUMBING, SIGNAGES Works | Ahmedabad Metro Rail Project Phase – 1 | M/s. Quality Building Solution | 06/06/2022 |
GMRC/O&M-ADMIN/TEA & COFFEE MATERIALS/2022 | Tender for Installation and Maintenance of Premix Tea/Coffee Vending Machine and Supply of Premix Tea/Coffee Materials/Consumables at GMRC offices | Ahmedabad Metro Rail Project Phase – 1 | M/s K & Z Facilities Management Private Limited | 26/05/2022 |
GMRC/O&M/PRINTING & OTHER RELATED WORKS/2022 | Providing printing, Photocopy (Xerox) & Related works for O&M wing of GMRC | Ahmedabad Metro Rail Project Phase – 1 | M/s. Teck Screen | 25/05/2022 |
GMRC/CIVIL MAINTENANCE/NS/PH-1/2022 | GENERAL MAINTENANCE CIVIL WORK FOR 4.776 KM OF NS CORRIDOR INCLUDING GYASPUR DEPOT, 4 STATIONS & VIADUCT OF AHMEDABAD METRO RAIL PROJECT PHASE-1. | Ahmedabad Metro Rail Project Phase – 1 | M/s. Harikrupa Construction co. | 24/05/2022 |
GMRC/EMU BATTERY CHARGER/ROLLING STOCK/2022 | Design, Manufacture, Supply, Installation, Testing and Commissioning of EMU Battery Charger cum Discharger for Rolling Stock | Ahmedabad Metro Rail Project Phase – 1 | M/s. Signotron (India) Pvt Ltd | 09/05/2022 |
GMRC/GD & AD/MP-L5R3/2022 | DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TWO SETS OF FULLY AUTOMATIC TRAIN WASH PLANT FOR AHMEDABAD METRO RAIL PROJECT PHASE-I | Ahmedabad Metro Rail Project Phase – 1 | M/s. Nissan Clean India pvt Ltd. | 04/05/2022 |
GMRC/DCD&BD/MP-L6/2021 | Design, Manufacture, Supply, Installation, Testing and Commissioning of Six Numbers of Bogie Turn Tables for Surat Metro Rail Project | Surat Metro Rail Project Phase – 1 | M/s. Renmack India Pvt. Ltd. | 04/05/2022 |
GMRC/NS/PKG-2/Sundry Items/2022 | SUNDRY ITEMS OF VIADUCT & STATIONS OF NORTH- SOUTH CORRIDOR, PACKAGE-2, AHMEDABAD METRO RAIL, PHASE-I | Ahmedabad Metro Rail Project Phase – 1 | M/s. Vibrant Construction Pvt. Ltd. | 30/04/2022 |
GMRC/DCD&BD/MP-L2/2021 | Design, Supply, Installation, Testing and Commissioning of Two Sets of Synchronized Pit Jacks for Lifting Three Car Trains and Two Sets of Synchronized Mobile Jacks for Lifting Three Car Trains for Surat Metro Rail Project | Surat Metro Rail Project Phase – 1 | M/s. Renmack India Pvt. Ltd. | 20/04/2022 |
GMRC/O&M/C&H-03/2022 | Mechanized Cleaning and Housekeeping works of Vastral Gam Station, Nirant Cross Road Station, Vastral Station, Rabari Colony Station, Amraivadi Station & Apparal Park Metro Stations for Ahmedabad Metro Rail Project Phase -1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Ultra Modern Agency | 11/04/2022 |
GMRC/TPA/R&R/R/2021 | Selection of Third Party Auditor for Rehabilitation and Resettlement activities for Surat Metro Rail Project Phase – I and Ahmedabad Metro Rail Project Phase-II | Gujarat Metro Rail Project | M/s Development Quest Foundation | 08/04/2022 |
GMRC/SYSTEM/PH-II/EM-01/2021 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF E & M WORKS FOR 15 ELEVATED STATIONS- KOTESHWAR ROAD, VISHVAKARMA COLLEGE, TAPOVAN CIRCLE, NARMADA CANAL, KOBA CIRCLE, JUNA KOBA, KOBA GAM, GNLU, PDPU, GIFT CITY, RAYSAN, RANDESAN, DHOLAKUVA CIRCLE, INFOCITY AND SECTOR-1 IN CONNECTION WITH GUJARAT METRO RAIL, PHASE – II, PACKAGE EM – 01 | Ahmedabad Metro Rail Project Phase – 2 | M/s. V K Building Services Pvt. Ltd. | 08/04/2022 |
GMRC/ DCD&BD/MP-L1/2021 | DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TWO SETS OF FULLY AUTOMATIC CNC UNDER-FLOOR WHEEL LATHE FOR SURAT METRO RAIL PROJECT | Surat Metro Rail Project Phase – 1 | M/s. HYT Engineering Company Pvt. Ltd. | 07/04/2022 |
GMRC/MMI/AHMEDABAD/PH-2/2021 | ENGAGEMENT OF CONSULTANCY SERVICES FOR DEVELOPMENT OF MULTI MODAL INTEGRATION PLAN FOR, (I) LINE-1 FROM MOTERA TO MAHATMA MANDIR – TWENTY (20) STATIONS & (II) LINE-2 FROM GNLU TO GIFT CITY – TWO (2) STATIONS, IN CONNECTION WITH AHMEDABAD METRO RAIL PROJECT, PHASE –II | Ahmedabad Metro Rail Project Phase – 2 | M/s. Urban Mass Transit Company Limited (UMTC) | 11/03/2022 |
GMRC/IESC/AHMEDABAD/PH-II/2021 | ENGAGEMENT OF AN INDEPENDENT ENVIRONMENTAL AND SOCIAL CONSULTANT FOR AHMEDABAD METRO RAIL PROJECT PHASE – II | Ahmedabad Metro Rail Project Phase – 1 | M/s. LEA Associates South Asia Pvt Ltd. | 25/02/2022 |
GMRC/NS/P-1 & Depot/CMRS Insp./Tender/2022 | Tender for Sundry Items of Viaduct & Stations of North – South Corridor, Package -1 and Gyaspur depot, Ahmedabad Metro Rail, Phase-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Vibrant Construction Pvt. Ltd. | 22/02/2022 |
GMRC/S&T/PHASE-1/IBS-1/2021 | Licensing of Space for In-building Solutions (IBS) for Providing Shared Mobile (Cellular) Coverage (2G/3G/4G) in Tunnels Section and Underground Stations of: Kankaria East, Kalupur Railway Station, Ghee Kanta and Shahpur of East-West Corridor of Gujarat Metro Rail Phase-I Network | Ahmedabad Metro Rail Project Phase – 1 | M/s. Space Teleinfra Pvt Ltd | 07/01/2022 |
GMRC/ADMIN/03/R/2021 | Supply of tea/Coffee Raw Materials at GMRC Offices | Ahmedabad Metro Rail Project Phase – 1 | M/s. Evista Exim (OPC) Pvt Ltd | 30/12/2021 |
GMRC/O&M/C&H-02/2021 | Housekeeping of Apparel Park depot including cleaning activities of complete depot area (office and sheds), pest control, Horticulture and office management for Ahmedabad Metro Rail Project Phase – 1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Green Globe Solutions | 28/12/2021 |
GMRC/ADMIN/XEROX/2021 | Photocopy/Xerox & related services at GMRC offices | Ahmedabad Metro Rail Project Phase – 1 | M/s. Teck Screen | 11/12/2021 |
GMRC/ADMIN/CAMC- AC/2021 | CAMC (Comprehensive Annual Maintenance Contract) for Split, Cassette Air conditioners and VRF Systems installed at GMRC Offices | Ahmedabad Metro Rail Project Phase – 1 | M/s. Ensol | 10/12/2021 |
GMRC/Signage/STNS/EW-R2/PH-1/2021 | DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF SIGNAGE AND GRAPHICS FOR SEVEN ELEVATED STATIONS (REACH-2 – THALTEJ GAM, THALTEJ, DOORDARSHAN KENDRA, GURUKUL ROAD, GUJARAT UNIVERSITY, COMMERCE SIX ROAD & S.P. STADIUM), ON EAST-WEST CORRIDOR OF AHMEDABAD METRO RAIL PHASE-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Satin Neo Dimesions Pvt Ltd | 08/12/2021 |
GMRC/IT/Internet/2021 | Internet Leased Line at GMRC Offices | Ahmedabad Metro Rail Project Phase – 1 | Blaznet Ltd. & Plus Net | 01/12/2021 |
GMRC/Signage/STNS/NS – PK2&PK4B/PH-1/2021 | DESIGN, MANUFACTURE, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF SIGNAGE AND GRAPHICS FOR ELEVEN ELEVATED STATIONS (PKG-2: PALDI, GANDHIGRAM, OLD HIGH COURT (INTERCHANGE), USMANPURA, VIJAYANAGAR, VADAJ & PKG-4B: RANIP, SABARMATI RAILWAY STATION, AEC, SABARMATI METRO STATION & MOTERA STADIUM) ON NORTH-SOUTH CORRIDOR OF AHMEDABAD METRO RAIL PHASE – 1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Satin Neo Dimesions Pvt Ltd | 23/11/2021 |
GMRC/GD & AD/MP-L9/2021 | Design, Manufacture, Supply, Installation, Testing and Commissioning of Two Sets of Bogie Test Stand for Ahmedabad Metro Rail Project Phase-I | Ahmedabad Metro Rail Project Phase – 1 | M/s. Renmakch India Pvt Ltd | 03/11/2021 |
GMRC/SYSTEM/SURAT/STNS/PKG-EM01/PH-1/2021 | SUPPLY & EXECUTION OF E & M WORKS FOR 10 ELEVATED STATIONS – KADARSHI NI NAL, MAJURA GATE, RUPALI CANAL, ALTHAN TENEMENT, ALTHAN GAM, VIP ROAD, WOMEN ITI, BHIMRAD, CONVENTION CENTER & DREAM CITY, IN CONNECTION WITH SURAT METRO RAIL, PHASE – I, PACKAGE EM – 01 | Ahmedabad Metro Rail Project Phase – 1 | M/s. PSP Project Ltd. | 26/10/2021 |
GMRC/GD & AD/MP-L10R/2021 | Design, Manufacture, Supply, Testing and Commissioning of Two No. of Standard Gauge Wagons (Well Type), Carrying Capacity – 30 T for Ahmedabad Metro Rail Project Phase-I | Ahmedabad Metro Rail Project Phase – 1 | M/s. Gourika India Limited | 26/10/2021 |
GMRC/CONS/VDCT+STNS/PKG-CS5/PH-1/2022 | Construction of 10.559 KM Elevated Viaduct and 11 Nos. Stations (Excl. E&M, Architectural Finishing and Roofing) from Bheshan Dead End (Ch. -949.63 m) to Majura Gate Station (Ch. 9090m) including Viaduct Ramp to Depot Entry near Bheshan for Surat Metro Rail Project Phase – 1, Corridor-2 (Package 1) | Ahmedabad Metro Rail Project Phase – 1 | M/s. Ranjit –DBL (JV) | 01/10/2021 |
GMRC/E&M Annual Rate Contract/EW/PH-1/2021 | Annual Rate Contract of E&M Works of Apparel Park Depot and 4 Elevated stations of E-W-1 Corridor of Phase-1 for Gujarat Metro Rail Corporation Ltd. | Ahmedabad Metro Rail Project Phase – 1 | M/s Mishra Enterprises | 30/09/2021 |
GMRC/CAMC HVAC WORKS/EW-1/PH-1/2021 | Comprehensive Annual Maintenance Contract of Variable Refrigerant Flow (VRF) System & split AC Unit installed at Apparel Park Depot and 4 elevated stations of E-W Corridor of Phase-1 for Gujarat Metro Rail Corporation Ltd. | Ahmedabad Metro Rail Project Phase – 1 | M/s Premium Enterprises | 15/09/2021 |
GMRC/DPR/01/2021 | Selection of Consultant for Preparation of Detailed Project Report (DPR) for Rail Based Mass Transit with Metro-Neo/Metro-Lite System for Vadodara, Rajkot, Bhavnagar and Jamnagar | Ahmedabad Metro Rail Project Phase – 1 | M/s. SYSTRA MVA Consulting India Private Limited in consortium with SYSTRA | 06/09/2021 |
GMRC/O&M/C&H-04/2021 | CLEANING OF DEPOT AREA INCLUDING ADMIN BLOCK, DIFFERENT BAYS, ROADS AND MAINTENANCE OF GARDEN ETC. AT GYASPUR DEPOT FOR AHMEDABAD METRO RAIL PROJECT – PHASE-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. M.J Solanki | 06/08/2021 |
GMRC/EOI/GEC/SURAT/2020 | Request for Expression of Interest for Selection of Consultants for Surat Metro Rail Project – Phase-1 | Surat Metro Rail Project Phase – 1 | M/s. SYSTRA, Consortium with EGIS RAIL S.A.& AECOM Asia Co. Ltd, and Sub –Consultant of Consulting Engineers Group Ltd. | 26/07/2021 |
GMRC/R&R/NGO/AHMEDABAD/PH-2/2021 | Selection of NGO for Rehabilitation and Resettlement Activities of Ahmedabad Metro Rail Project Phase-2 | Ahmedabad Metro Rail Project Phase – 2 | M/s. Saath livelihood Services | 02/07/2021 |
GMRC/R&R/NGO/SURAT/PH-1/2021 | Selection of NGO for Rehabilitation and Resettlement Activities of Surat Metro Rail Project Phase-1 | Surat Metro Rail Project Phase – 1 | M/s. Saath livelihood Services | 02/07/2021 |
GMRC/CONS/DC 01/Surat/PH-1/2021 | DEVELOPMENT AND CONSTRUCTION OF DREAM CITY DEPOT INCLUDING METRO BHAVAN, OCC AND ASSOCIATED E&M WORKS UNDER CORRIDOR C1, SARDHANA TO DREAM CITY, IN CONNECTION WITH SURAT METRO RAIL, PHASE – I, PACKAGE DC – 01 | Surat Metro Rail Project Phase – 1 | M/s. ITD Cementation India Ltd | 30/06/2021 |
GMRC/DDC/UG-SES/SURAT/PH-1/2021 | DETAILED DESIGN CONSULTANCY SERVICES FOR SUBWAY ENVIRONMENT SIMULATION (SES) STUDIES & COMPUTATIONAL FLUID DYNAMICS (CFD) ANALYSIS AND SIZING OF TUNNEL VENTILATION SYSTEM AND MAJOR ECS EQUIPMENT FOR ENTIRE UNDERGROUND SECTION OF SURAT MRTS PH-1 FOR GUJARAT METRO RAIL CORPORATION (GMRC) LIMITED | Surat Metro Rail Project Phase – 1 | M/s. Rina Consulting SPA | 17/06/2021 |
GMRC/O&M-DEPOT/01/2021 | TENDER DOCUMENT FOR “SUPPLY AND INSTALLATION OF METAL STORAGE RACK FOR TRACTION DEPARTMENT AT APPAREL PARK DEPOT OF GMRC” | Ahmedabad Metro Rail O&M Phase – 1 | M/s. Compress (India) Pvt Ltd. | 11/06/2021 |
GMRC/DDC/ELEV-VDCT+STNS & DEPOT/SURAT/PH-1/R/2020 | DETAILED DESIGN CONSULTANCY SERVICES FOR CORRIDOR 1 FROM SARTHANA DEAD END (CH: -450M) TO END OF UG RAMP (CH: 3950M), ELEVATED VIADUCT, ELEVATED STATION (4 STATIONS) INCLUDING VIADUCT PORTION WITHIN THE STATIONS AND TRANSITION SPANS ON EITHER SIDE OF THE STATIONS” (II) “DETAILED DESIGN CONSULTANCY SERVICES FOR CORRIDOR 2 FROM BHESAN DEAD END (CH: -949.63M) TO SAROLI DEAD END (CH: 17791.9M), ELEVATED VIADUCT, ELEVATED STATION (18 STATIONS) INCLUDING VIADUCT PORTION WITHIN THE STATIONS AND TRANSITION SPANS ON EITHER SIDE OF THE STATIONS & DEPOT AT BHESAN” IN CONNECTION WITH SURAT METRO RAIL PROJECT, PHASE -I | Surat Metro Rail Project Phase – 1 | M/s. Delhi Integrated Multi Modal Transit System Limited, M/s Tec-Cuatro S.A. and M/s NPEC Consultancy Private Limited. | 03/06/2021 |
GMRC/SYSTEM/RFTP-02(R2)/DEPOT/EW-NS/2023 | BID FOR DESIGN, ENGINEERING, SUPPLY & PROCUREMENT, ERECTION, TESTING, COMMISSIONING AND COMPREHENSIVE OPERATION & MAINTENANCE FOR 5 (FIVE) YEARS FOR 406 KW (AC) GRID CONNECTED ROOFTOP SOLAR PHOTOVOLTAIC POWER PROJECT ON ROOFTOP OF VARIOUS BUILDINGS AT TWO LOCATIONS (I) SITE 1- APPAREL PARK DEPOT (206 KW) AND (II) SITE 2- GYASPUR DEPOT (200 KW) OF GUJARAT METRO RAIL CORPORATION (GMRC) LTD, GUJARAT. | Ahmedabad Metro Rail O&M Phase – 1 | M/s. Sai Cabtech Pvt. Ltd | 15/04/2021 |
GMRC/CONS/UG-1/PKG-CS2/PH-1/2020 | DESIGN, CONSTRUCTION AND COMPLETION OF UNDERGROUND STATIONS AND TUNNEL INCLUDING FINISHES FROM KAPODRA RAMP TO SURAT RAILWAY STATION FROM CHAINAGE 3700M TO CHAINAGE 7160.6M, COMPRISING TWIN BORED UNDERGROUND TUNNEL BETWEEN NORTHERN RAMP AND SURAT RAILWAY METRO STATION, ALL CUT AND COVER PORTION INCLUDING THREE UNDERGROUND STATIONS VIZ. KAPODRA, LABHESHWAR CHOWK AND CENTRAL WAREHOUSE WITH ENTRY/EXITS & CONNECTING SUBWAY BY BOX PUSHING METHOD AND A PORTION OF NATM AND LAUNCHING AND RECEIVING CHAMBERS OF TBM FOR SURAT METRO RAIL PROJECT, PHASE-I | Surat Metro Rail Project Phase – 1 | M/s Gulermak- SAM India Surat Metro UG-1 P1 Joint Venture (JV) | 06/03/2021 |
GMRC/O&M-DEPOT/BULLET PROOF MORCHA/2020 | SUPPLY OF 16 NOS. OF BULLET PROOF MORCHA FOR STATION AND DEPOT OF GMRC | Ahmedabad Metro Rail O&M Phase – 1 | M/s. Jindal Stainless (Hisar) Limited | 29/01/2021 |
GMRC/CONS/UG-2/PKG-CS3/PH-1/2020 | DESIGN, CONSTRUCTION AND COMPLETION OF UNDERGROUND STATIONS AND TUNNEL INCLUDING FINISHES FROM SURAT RAILWAY STATION TO CHOWK BAZAR RAMP FROM CHAINAGE 7160.6M TO CHAINAGE 10720M, COMPRISING TWIN BORED UNDERGROUND TUNNEL BETWEEN SURAT RAILWAY STATION AND SOUTH RAMP, ALL CUT AND COVER PORTION INCLUDING THREE UNDERGROUND STATIONS VIZ. CHOWK BAZAR, MASKATI HOSPITAL AND SURAT RAILWAY STATION WITH ENTRY/EXITS & CONNECTING SUBWAY BY BOX PUSHING METHOD AND A PORTION OF NATM AND LAUNCHING AND RECEIVING CHAMBERS OF TBM FOR SURAT METRO RAIL PROJECT, PHASE-I | Ahmedabad Metro Rail Project Phase – 1 | J Kumar Infraprojects Limited | 08/01/2021 |
GMRC/CONS/VDCT+STNS/PKG-CS1/PH-1/2020 | CONSTRUCTION OF 11.6 KM ELEVATED VIADUCT FROM KADARSHA NI NAL TO DREAM CITY DEAD END INCLUDING RAMP FOR DEPOT ENTRY NEAR DREAM CITY AND 10 STATIONS (EXCL. E&M, ARCHITECTURAL FINISHING AND ROOFING) FOR SURAT METRO RAIL PROJECT PHASE – 1, PACKAGE – CS1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Sadbhav Engineering Limited- SP Singla Constructions Pvt Ltd. (JV) | 08/01/2021 |
GMRC/S&T/AFC-01/SURAT/PH-1/2020 | SELECTION OF CONSULTANCY FIRM FOR FINANCIAL FEASIBILITY REPORT PREPARATION OF PPP AFC REVENUE MODEL FOLLOWED BY OPEN LOOP EMV & RUPAY BASED TICKETING RFP SUBMISSION FOR SURAT METRO RAIL PROJECT PHASE-I | Surat Metro Rail Project Phase – 1 | M/s. Ernst & Young LLP | 30/12/2020 |
GMRC/CONST/R2/Thaltej Gam To Thaltej/PH-1/2020 | Construction of Elevated Viaduct from Dead End P1 to P59 in E-W corridor R2 including station Thaltej Gam, including western side transition span between station and viaduct for Ahmedabad Metro Rail Project Phase-I | Ahmedabad Metro Rail Project Phase – 1 | M/s. Dineshchandra R Agrawal Infracon Pvt. Ltd. | 24/12/2020 |
GMRC/ADMIN/05/R/2020 | Tender for Facility Management, especially for providing manpower for GMRC offices and housekeeping services including housekeeping materials | Gujarat Metro Rail Project | M/s Het- Chint Hospitalities Pvt. | 22/12/2020 |
GMRC/CONS/VDCT+STNS/PKG-C1/PH-2/2020 | NIT – Construction of i) 8.124 km elevated viaducts and 8 stations from Ch. 17343.443m to 25467.443m, ii) 5.420 km elevated viaducts and 3 stations from GNLU to GIFT City and iii) 0.815 km elevated viaducts and additional platform at Koteshwar Road station for Ahmedabad Metro Rail Project Phase-II from Motera to Mahatma Mandir and GNLU to GIFT City (excl. E&M, Architectural, finishing and roofing) – Package – C1 | Ahmedabad Metro Rail Project Phase – 1 | M/s AFCONS Infrastructure Limited | 07/12/2020 |
GMRC/CONS/VDCT+STNS/PKG-C2/PH-2/2020 | NIT – Construction of 6.478km elevated viaducts and 5 stations from CH. 25467.443m to 31945.443m and 0.679 km elevated viaducts and ramp for depot entry in connection with Ahmedabad Metro Rail Project Phase – II from Motera Satdium to Mahatma Mandir (excl. E&M, architectural finishing and roofing) – Package-C2 | Ahmedabad Metro Rail Project Phase – 1 | M/s Ranjit Buildcon Limited | 06/11/2020 |
GMRC/MMI/SURAT/PH-01/2020 | ENGAGEMENT OF CONSULTANCY SERVICES FOR DEVELOPMENT OF MULTI MODAL INTEGRATION PLAN FOR, (I) CORRIDOR-1 FROM SARTHANA (CH: 0.0) TO DREAM CITY (CH: 20710.30 M) – TWENTY (20) STATIONS & (II) CORRIDOR-2 FROM BHESAN (CH: 0.0 M) TO SAROLI (CH: 17341.80 M) – EIGHTEEN (18) STATIONS, UNDER SURAT METRO RAIL PROJECT, PHASE – I | Surat Metro Rail Project Phase – 1 | M/s Rites Ltd Consortium with Rina Consulting S.P.A. | 27/10/2020 |
GMRC/Road Resurface/Zones/PH-1/2020 | ROAD REGRADING & RESURFACING OF DIFFERENT ROADS IN VARIOUS ZONES IN AHMEDABAD CITY ACROSS METRO RAIL CORRIDOR | Ahmedabad Metro Rail Project Phase – 1 | M/s Apex Tarmac Pvt Ltd | 15/10/2020 |
GMRC/NFBR/01/2020 | Selection of Consultant for identifying Alternate Revenue Models / Non-fare Box Revenue Models for Ahmedabad Metro Rail Project Phase – 1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Ernst & Young LLP | 14/10/2020 |
GMRCL/O&M/Uniform/R/PH-1/2020 | Supply of Uniform & Accessories-2020 1. Uniform: Clothes 2. Uniform: Accessories for Ahmedabad Metro Rail Project Phase-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Kumar Cotton Mills Pvt Ltd | 25/08/2020 |
GMRC/GD&AD/MP-L5R2/2019 | DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TWO SETS OF FULLY AUTOMATIC TRAIN WASH PLANT FOR AHMEDABAD METRO RAIL PROJECT PHASE-I | Ahmedabad Metro Rail Project Phase – 1 | M/s. Inventa Cleantec Pvt Ltd | 19/08/2020 |
GMRC/O&M/C&H-03/2019 | Train Cleaning at Apparel Park Depot And Gyaspur Depot And Terminal stations For Ahmedabad Metro Rail Project – Phase-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s D G Nakrani | 20/06/2020 |
Tender No. MEGA/UG/E&M-01 | Design, Manufacture, Supply, Installation, Testing and Commissioning of (A).Electrical and Mechanical (E&M) Including Hydraulics, Fire Safety Systems, UPS & DG Sets (B). Environmental Control System (ECS) and Building Management System – BMS (C). Tunnel Ventilation System (TVS) and TVS – SCADA Works, for Underground Stations, Intermediate Vent Shaft and Associated Tunnels of East – West Corridor of Ahmedabad Metro Rail Project Phase – I | Ahmedabad Metro Rail Project Phase – 1 | M/s Sterling & Wilson Jindun Consortium | 11/06/2020 |
GMRC/ARCH/STNS/PKG-CA1/PH-1/2021 | Architectural finishing, roofing, plumbing, signage etc. from Kadarsha Ni Nal to Dream City dead end of Corridor-1, Surat Metro Rail, Phase-I | Ahmedabad Metro Rail Project Phase – 1 | M/s. Quality Buildcon Pvt. Ltd. | 20/05/2020 |
GMRC/ADMIN/06/2019 | “Supply of Stationery items at GMRC office” in Ahmedabad | Ahmedabad Metro Rail Project Phase – 1 | M/s Shree Patel Enterprises | 11/03/2020 |
GMRC/Comm./ Sale of old vehicle/01/2020, તા. ૩૧-૦૧-૨૦૨૦ | TENDER NOTICE FOR SALE OF OLD VEHICLE | Ahmedabad Metro Rail Project Phase – 1 | Mr. Sharadkumar B Joshi | 05/03/2020 |
GMRC/O&M-1/PH-1/R/2019 | SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 12 NOS. OF X-RAY BAGGAGE MACHINE WITH COMPREHENSIVE ANNUAL MAINTENANCE CONTRACT (CAMC) OF 10 YEARS INCLUDING 2 YEARS OF DEFECT LIABILITY PERIOD (DLP) FOR AHMEDABAD METRO RAIL PROJECT PHASE – 1 | Ahmedabad Metro Rail O&M Phase – 1 | Evolve Technologies and Services Pvt. Ltd. | 14/02/2020 |
GMRC/ADMIN/07/2019 | Supply of Printed Stationery Items at GMRC offices in Ahmedabad/Gandhinagar | Ahmedabad Metro Rail Project Phase – 1 | Deep Computrade | 11/02/2020 |
GMRC/TOPOGRAPHICAL SURVEY/PH-1/CORRIDOR-2/2019 | Detailed Topographical Survey work using total station / DGPS & Drone from Bhesan to Saroli under Surat Metro Rail Project, Phase – I | Surat Metro Rail Project Phase – 1 | M/s. M K Soil Testing Laboratory | 04/02/2020 |
GMRC/ADMIN/04/2019 | “Providing Security Services for Project Offices and Sites of GMRC” | Gujarat Metro Rail Project | M/s Kutch Security Services | 22/01/2020 |
GMRC/TOPOGRAPHICAL SURVEY/N-S/PH-2/2019 | Detailed Topographical Survey work using total station / DGPS & Drone for extension of North – South Corridor from Motera Stadium (Ch: 17343.443) to Mahatma Mandir (Ch: 39484.36) and extended GNLU – Gift City corridor Elevated Viaduct & Elevated Metro rail Stations (Twenty two numbers) including viaduct portion within the station and transition spans on either side of the stations and Depot – cum – workshop at Indroda under Ahmedabad Metro Rail Project, Phase – II | Ahmedabad Metro Rail Project Phase – 1 | M/s. M K Soil Testing Laboratory | 09/01/2020 |
GMRC/ADMIN/08/2019 | Tender for Photocopy/Xerox & related services at GMRC offices | Ahmedabad Metro Rail Project Phase – 1 | M/s Ambica Xerox | 07/01/2020 |
GMRC/ADMIN/02/2019 | Tender for CAMC (Comprehensive Annual Maintenance Contract) for Split, Cassette Air Conditioners and VRF Systems Installed at GMRC Offices | Ahmedabad Metro Rail Project Phase – 1 | M/s Ensol | 07/01/2020 |
GMRC/ADMIN/03/2019 | TENDER FOR SUPPLY OF TEA/COFFEE AT GMRC OFFICES | Ahmedabad Metro Rail Project Phase – 1 | M/s. GO 4 IT PVT.LTD | 01/01/2020 |
GMRC/ADMIN/03/2019 | Tender for Supply of Tea and Coffee at GMRC Offices | Gujarat Metro Rail Project | Ms. Go4it Pvt. Ltd | 01/01/2020 |
GMRC/O&M-ADMIN/2/2019 | “Hiring of vehicles on monthly basis for operation and maintenance department of GMRC.” | Ahmedabad Metro Rail Project Phase – 1 | M/s KARANI ROADWAYS PRIVATE LTD | 28/11/2019 |
GMRC/O&M/C&H-02/2019 | Cleaning of Depot area including admin block, different bays, roads and maintenance of garden etc. at Apparel Park Depot for Ahmedabad Metro Rail Project – Phase-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s .D G Nakrani | 25/10/2019 |
GMRC/O&M/C&H-01/2019 | Mechanized Cleaning and Housekeeping works of Vastral Gam, Nirant Cross Road, Vastral, Rabari Colony, Amraivadi & Apparel Park Metro Stations | Ahmedabad Metro Rail Project Phase – 1 | M/s. Rajdeep Enterprise | 16/10/2019 |
GMRC/Civil Maintenance /EW/PH-1/2020 | Civil Maintenance work for 6.7 km Viaduct, Apparel Park Depot and 6 Stations of Priority reach of E-W Corridor for Ahmedabad Metro rail Project Phase-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s Mishra Enterprise | 07/09/2019 |
GMRC/S&T/PARTNER BANK-01 | Selection of Partner Bank for instant issuance of NCMC compliant card and acquiring of digital transactions using EMV and NCMC cards issued by any Bank for Ahmedabad Metro Rail Project Phase-I | Ahmedabad Metro Rail Project Phase – 1 | M/s Paytm Payment Bank Limited | 27/08/2019 |
GMRC/Mock-up/Shifting/2019 | SHIFTING OF MOCK-UP COACH FROM SABARMATI RIVERFRONT IN AHMEDABAD TO GYASPUR DEPOT IN AHMEDABAD | Ahmedabad Metro Rail Project Phase – 1 | M/s. Globe Ecologistics Pvt. Ltd. | 16/07/2019 |
MEGA/DDC/ELEV-VDCT,STNS & DEPOT/CORRIDOR-1/PH-1/2018(Surat Metro Rail Phase-I) | Engagement of Detailed Design Consultancy Services for Corridor-1 from Dream city Dead End (Ch: 21610.3) to Majuragate (Ch: 12313.80) Elevated Viaduct, Elevated Metro-Rail Stations – (Nine Numbers) including viaduct portion within the station and transition spans on either side of the stations & Depot at Dream city under Surat Metro Rail Project- Phase -1, hereinafter referred as “DDC Services for Surat MRTS-PH-I” | Ahmedabad Metro Rail Project Phase – 1 | M/s. SYSTRA MVA Consulting (India) Pvt. Ltd. | 09/04/2019 |
MEGA/GD&AD/MP-S2/R/2018 | Supply of Twelve Nos. (Three sets of four number each) of Car Body Stand (10 ton capacity) for Ahmedabad Metro Rail Project Phase – 1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Sumer & Co. (Regd.) | 22/03/2019 |
MEGA/GEOTECH/ELEV-VDCT, STNS & DEPOT/N-S/PH-2/2018 | “Engagement of Geotechnical Investigation Agency for Elevated line (28.26 km) including Twenty Two numbers of Elevated Stations and Depot at Indroda under Ahmedabad Metro Rail Project – Phase – 2, hereinafter referred as “Geotechnical Investigation Agency for Ahmedabad MRTS-PH-II | Ahmedabad Metro Rail Project Phase – 1 | M/s. M K Soil Testing Laboratory | 26/02/2019 |
MEGA/DDC/ELEV-VDCT & STNS/N-S/PH-2/2018 | Engagement of Detailed Design Consultancy Services for extension of North- South Corridor from Motera Stadium (Ch: 17343.443) to Mahatma Mandir (Ch: 39484.360) Elevated Viaduct & Elevated Metro-Rail Stations – (Twenty Numbers) including viaduct portion within the station and transition spans on either side of the stations under Metro Rail Project- Phase -2, hereinafter referred as “DDC Services for Ahmedabad MRTS-PH-II” | Ahmedabad Metro Rail Project Phase – 1 | M/s. SYSTRA in Consortium with SYSTRA MVA Consulting (India) Pvt. Ltd. | 21/02/2019 |
MEGA/Signage/ STNS-DEPOT/E-W/PH-1/2018 | Manufacture, Supply Installation, Testing and Commissioning of Signage and Graphics for Six Elevated Stations (Part-1, Vastral Gam, Apparel Park & Depot Cum Workshop – Apparel Park Depot), (Part-2- Nirant Cross Road, Vastral, Rabari Colony, Amraiwadi ) on East-West Corridor of Ahmedabad Metrorail Phase-1, hereinafter referred as “Signage Work for Ahmedabad MRTS-(EW)-PH- | Ahmedabad Metro Rail Project Phase – 1 | M/s. Satin Neo Dimensions Pvt. Ltd | 11/02/2019 |
MEGA/GD&AD/MP-L7/2017 | Design, Manufacture, Supply, Installation, Testing and Commissioning of Ten Numbers of Bogie Turn Tables for Ahmedabad Metro Rail Project Phase-I | Ahmedabad Metro Rail Project Phase – 1 | M/s. Cyclosystem Pte. Ltd. Singapore | 06/02/2019 |
GMRC/O&M-ADMIN/4/2019 | Providing Services related to Printing, Photocopy (Xerox) and other related Work for Apparel Park Depot and Stations | Ahmedabad Metro Rail Project Phase – 1 | M/s. Sanskar Printers | 29/01/2019 |
MEGA/GD&AD/MP-S3/2018 | Supply of Two Nos. of Self-propelled Scissor Type Work Lift Platform for Ahmedabad Metro Rail Project Phase – 1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Godrej & Boyce Mfg. Co. Ltd. | 26/12/2018 |
MEGA/GD & AD/MP-L3/2016 | Tender Notification for inviting bids for “Design, Manufacture, Supply, Testing and Commissioning of Four Numbers of Electric Bogie Tractors for Shunting and Placement of Six Car Rakes for Ahmedabad Metro Rail Project Phase-I, vide Tender No: MEGA/GD & AD/MP-L3/2016” | Ahmedabad Metro Rail Project Phase – 1 | M/s. Zagro Bahn-Und Baumaschinon Gmbh, Germany | 18/12/2018 |
MEGA/SYSTEM/RFTP-01/DEPOT/EW/2018 | Design, Engineering, Supply & Procurement, Erection, Testing, Commissioning and Comprehensive Operation & Maintenance for 5 (Five) Years for 200 KW Grid Connected Rooftop Solar Photovoltaic Power Project on Rooftop of Admin OCC and Training centre Building in Apparel Park Depot of Metro-Link Express for Gandhinagar and Ahmedabad (MEGA) Company Ltd | Ahmedabad Metro Rail Project Phase – 1 | M/s. Shashwat Cleantech Pvt. Ltd. | 17/12/2018 |
MEGA/GD&AD/MP-L6/2017 | DESIGN, MANUFACTURE, SUPPLY, TESTING AND COMMISSIONING OF TWO NUMBERS OF BATTERY POWERED ELECTRIC LOCOMOTIVES FOR RESCUE OF STRANDED TRAINS AND SHUNTING OF SIX CAR RAKES FOR AHMEDABAD METRO RAIL PROJECT PHASE-I | Ahmedabad Metro Rail Project Phase – 1 | M/s. ZEPHIR S.p.A | 15/12/2018 |
MEGA/Road Resurface/Zones/PH‐1/2018 | Road Regrade & Resurface of different roads in various Zones in Ahmdedabad city across Metro Rail Corridor | Ahmedabad Metro Rail Project Phase – 1 | M/s. Maruti Infracreation Pvt. Ltd. | 10/12/2018 |
MEGA/GD&AD/MP-S1/R/2018 | Supply of two nos. of Mobile Lifting Table (3 ton) for Ahmedabad Metro Rail Project Phase-1 of Metro–Link Express for Gandhinagar & Ahmedabad (MEGA) Company Ltd | Ahmedabad Metro Rail Project Phase – 1 | M/s. Star M-Tech Engineers & Decorators (P) Ltd. | 26/11/2018 |
MEGA/S&T/ISA-01 | Independent Safety Assessment and Audit of S&TC System covering all safety critical and safety related functions and its safety related interface requirement with Interfaced System for Ahmedabad Metro Rail Project Phase-I | Ahmedabad Metro Rail Project Phase – 1 | M/s. Certifer SA, France | 20/09/2018 |
MEGA/F&A/Tender Notice/02/2018 | Tender for Tax Consultancy work | Ahmedabad Metro Rail Project Phase – 1 | M/s. Pankaj R Shah & Associates | 25/06/2018 |
MEGA/L & E/1 | Design, Manufacture, Supply, Installation, Testing and Commissioning of Machine Room-Less & Gear-Less Lifts (LOT-1) and Heavy-Duty Escalators (LOT-2) for Ahmedabad Metro Rail Project Phase-I | Ahmedabad Metro Rail Project Phase – 1 | LOT-1(M/s. Johnson Lifts Private Limited, India & SJEC Corporation, China – Consortium),LOT-2(M/s. Certifer SA, France) | 19/06/2018 |
MEGA/GD&AD/MP-L4/2016 | Design, Manufacture/Assembly, Supply, Testing and Commissioning of Two Sets of Rail cum Road Vehicle along with Re-railing and Rescue Equipment for Ahmedabad Metro Rail Project Phase-I | Ahmedabad Metro Rail Project Phase – 1 | M/s. Zagro Bahn und Baumaschinon Gmbh, Germany | 02/06/2018 |
IFB No: MEGA/S&T/PSD-01 | Design, Manufacture, Supply, Installation, Integration, Testing and Commissioning of Platform Screen Doors System for Ahmedabad Metro Rail Project Phase 1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Shenzhen Fangda Automatic System Co. Ltd. | 18/05/2018 |
MEGA/F&A/Tender Notice/01/2018 | Chartered Accountant firms for the Internal Audit | Ahmedabad Metro Rail Project Phase – 1 | M/s. T R Chadha & Co. LLP | 07/05/2018 |
MEGA/GD/Barricades/Disposal/1 | Disposal of Old MS Barricades through Spot-Disposal On ‘As is where is basis’ | Ahmedabad Metro Rail Project Phase – 1 | M/s. Mukesh Enterprise | 23/04/2018 |
MEGA/Admin/E-TENDER Notice/05/2018 | Providing Photocopy(Xerox)and related Services | Gujarat Metro Rail Project | Ms.Ashiravd Xerox | 01/04/2018 |
MEGA/Admin/E-Tender/04/2018 | Providing Tea Coffee Services | Gujarat Metro Rail Project | M/s. Go4it Pvt. Ltd | 01/04/2018 |
MEGA/GD & AD/MP-L2/2016 | Tender Notification for inviting bids for “Design, Supply, Installation, Testing and Commissioning of Two Sets of Synchronized Pit Jacks for Lifting Three Car Trains and Two Sets of Synchronized Mobile Jacks for Lifting Three Car Trains for Ahmedabad Metro Rail Project Phase-I” | Ahmedabad Metro Rail Project Phase – 1 | M/s. Neuero Technology Gmbh | 23/03/2018 |
IFB No: MEGA/S&T/AFC-01 | Design, Manufacture, Supply, Installation, Testing and Commissioning of Automated Fare Collection Systems for Ahmedabad Metro Rail Project Phase 1, vide IFB No: MEGA/S&T/AFC-01 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Nippon Signal Ltd. | 28/02/2018 |
MEGA/ADMIN/E-TENDER NOTICE /03/2018 | E-Tender for Providing Security Services | Gujarat Metro Rail Project | Kutch Security Services | 01/01/2018 |
MEGA/ADMIN/E-TENDER NOTICE/02/2018 | E-Tender Document for Supplying of Stationery Items | Gujarat Metro Rail Project | Finaloffice and home Solutions Pvt.Ltd | 01/01/2018 |
MEGA/ADMIN/E-TENDER NOTICE /01/2018 | E-Tender for Hiring of Vehicles on Monthly & Casual Basis | Gujarat Metro Rail Project | Ms. Patidar Travels Pvt.Ltd | 01/01/2018 |
MEGA/SAP/2017 Dated: 01-05-2017 | Procurement of Services for Post Implementation Support of SAP Systems at MEGA | Ahmedabad Metro Rail Project Phase – 1 | KPIT Technologies | 01/12/2017 |
MEGA/S&T/TEL-01 | Tender Notification for inviting bids for “Design, Manufacture, Supply, Installation, Testing and Commissioning of Telecommunication Systems., vide IFB No:MEGA/S&T/TEL-01” | Ahmedabad Metro Rail Project Phase – 1 | M/s larson & Toubro Limited. | 13/10/2017 |
MEGA/EP/1 | Tender Notification for inviting bids for “Supply, Erection, Testing and Commissioning of Power Supply Receiving & Distribution System, 750 V DC Third Rail Traction Electrification and SCADA System for Ahmedabad Metro Rail Project Phase-1., vide IFB No: MEGA/EP/1″ | Ahmedabad Metro Rail Project Phase – 1 | Consortium of SIEMENS LTD. INDIA AND SIEMENS AG, GERMANY | 10/10/2017 |
MEGA/AJT/1B | Tender Notification for inviting bids for “Supply of 3500 MT UIC60/60E1, IRS- T12- 2009, 880 Grade Rails for Ahmedabad Metro Rail Project Phase-1” | Ahmedabad Metro Rail Project Phase – 1 | M/s. Steel Authority of India Ltd. | 30/08/2017 |
MEGA/AJT/2 | Tender Notification for inviting bids for “Design, Supply, Installation, Testing and Commissioning of Ballastless Track of Standard Gauge, North South Corridor from APMC to Motera Stadium in elevated and East West Corridor from Thaltej Gam to Vastral Gam in elevated and underground sections along with Ballasted/Ballastless Tracks in Depot at Gyaspur and Apparel Park of Ahmedabad Metro Rail Project Phase 1” | Ahmedabad Metro Rail Project Phase – 1 | M/s larson & Toubro Limited( Railway Business) | 28/06/2017 |
MEGA/GD & AD/MP-L1/2016 | Tender Notification for inviting bids for “Design, Supply, Installation, Testing and Commissioning of Two Sets of Fully Automatic CNC Under-floor Wheel Lathe and Electric Shunter for Ahmedabad Metro Rail Project Phase-I.” | Ahmedabad Metro Rail Project Phase – 1 | M/s HYT Engineering Company Private Limited | 02/06/2017 |
MEGA/AJT/1A | Tender Notification for inviting bids for “Supply of 10600 MT UIC 60/60E1, IRS-T12-2009, 1080 Grade Head Hardened Rails for Track work of Ahmedabad Metro Rail Project Phase-I | Ahmedabad Metro Rail Project Phase – 1 | M/s Mitsui Limited, Japan | 15/05/2017 |
IFB No: MEGA/AJT/1C | Tender Notification for inviting bids for “Design & Supply of UIC60/60E1 Turnouts for Ahmedabad Metro Rail Project Phase-1, vide IFB No: MEGA/AJT/1C | Ahmedabad Metro Rail Project Phase – 1 | Consortium of Vossloh Cogifer SA, Vossloh Cogifer Turnouts India Pvt. Ltd. and Vossloh Beekay Casting Ltd | 12/05/2017 |
MEGA/DDC/UG-SAT/SES/2016 | Detailed Design Consultancy Services for Subway Environment Simulation (SES) studies & Computational Fluid Dynamics (CFD) Analysis and Sizing of Tunnel Ventilation System (TVS) and Major ECS Equipments for Entire Underground Section of MEGA Project, Phase I | Ahmedabad Metro Rail Project Phase – 1 | M/s RINA Consulting SPA | 11/04/2017 |
IFB No: MEGA/S&T/SIG-01 | Tender of Design, Manufacture, Supply, Installation, Testing and Commissioning of Signalling and Train Control Systems., vide IFB No: MEGA/S&T/SIG-01 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Nippon Signal Co. Ltd., Japan | 17/03/2017 |
MEGA/EW/UGSAT/PKG1/CIVIL/2016 | Tender Notification for inviting bids for “Design and Construction Underground Stations and Tunnel including Finishes and excluding PHE, Electrical and HVAC from East End of East Ramp to East End of Launching Shaft near Kalupur Metro Station from Chainage 14328.88m to Chainage 11882.88m, which comprises of East Ramp, Twin Bored Underground Tunnel between East Ramp and Kalupur Metro Station all cut and cover portion including Two Underground Station Kankaria East and Kalupur Metro Station including a portion of NATM and Launching and Receiving Chambers of TBM for Ahmedabad Metro Rail Project, Phase-1. | Ahmedabad Metro Rail Project Phase – 1 | M/s. AFCONS INFRASTRUCTURE LIMITED | 02/03/2017 |
MEGA/CONS/STNS/N-S/PKG-4B/R/2016 | Tender Notification for inviting bids for “Construction of Elevated Metro Rail Stations – Five (5) Numbers Including Viaduct Portion Within the Stations and Transition Spans On Either Side of the Stations (Motera, Sabarmati, AEC, Sabarmati Railway Station and Ranip) for Pkg- 4B of North-South Corridor for Ahmedabad Metro Rail Project Phase-I” | Ahmedabad Metro Rail Project Phase – 1 | M/s. Pratibha Industries Limited – Ranjit Buildcon Ltd. (JV) | 06/02/2017 |
MEGA/EW/UGSAT/PKG2/CIVIL/2016 | Tender Notification for inviting bids for Design and Construction of Underground Stations and Tunnel including Finishes and excluding PHE, Electrical and HVAC from East End of Launching Shaft near Kalupur Station to West End of West Ramp from Chainage 11882.88m to Chainage 7503.24m, which comprises of West Ramp, Twin Bored Underground Tunnel between Launching shaft near Kalupur Station and West Ramp all cut and cover portion including two Underground Station Shahpur and Ghee Kanta Station, including a portion of NATM and Launching and Receiving Chambers of TBM for Ahmedabad Metro Rail Project, Phase-1 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Larson & Toubro Limited | 25/01/2017 |
NIT: MEGA/CONS/VDCT+STNS/R2/E-W/2016 | Tender Notification for inviting bids for “Construction of Elevated Viaduct from Thaltej Gam to End of Western Ramp (ch -710 to + 7503) in E-W Corridor R2 including Bridge over Sabarmati river and 7 Stations Thaltej Gam, Thaltej, Doordarshan Kendra, Gurukul, Gujarat University, Commerce Six Road and Stadium Circle and excluding Interchange Old High Court Station for Ahmedabad Metro Rail Project Phase-I” | Ahmedabad Metro Rail Project Phase – 1 | M/s. China Civil Engineering Construction Corporation – Tata Projects Limited (JV) | 25/01/2017 |
MEGA/ADMIN/E-TENDERNOTICE/01/2017 | FACILITY MANAGEMENT ESPECIALLY FOR PROVIDING MANPOWER FOR OFFICE AND HOUSE KEEPING SERVICES WITH MATERIALS | Ahmedabad Metro Rail Project Phase – 1 | M.P.Enterprises and Associates Ltd | 01/01/2017 |
MEGA/ADMIN/E-TENDER NOTICE/03/2017 | E-TENDER DOCUMENT FOR SUPPLYING OF STATIONERY ITEMS | Ahmedabad Metro Rail Project Phase – 1 | Final Office & Home Solutions Pvt Ltd. | 01/01/2017 |
MEGA/ADMIN/E-TENDER NOTICE/02/2017 | E-TENDER FOR PROVIDING SECURITY SERVICES | Ahmedabad Metro Rail Project Phase – 1 | Tops Security Ltd | 01/01/2017 |
MEGA/CONS/VDCT+STNS/PKG-2/N-S/2016 | Tender of Construction of Viaduct Corridor from end of Shreyas Station (North) to Ranip Station (South) all elevated Viaduct portion from chainage (+)3246.50 m to (+)12182.20 m and Elevated Metro Stations (Six Numbers) viz. Paldi, Gandhigram, Old High Court (Interchange station on E-W Corridor), Usmanpura, Vijaynagar, Vadaj and an Underpass at Paldi Station, Package-2 of North-South Corridor for Ahmedabad Metro Rail Project Phase-1., vide IFB No: MEGA/CONS/VDCT+STNS/PKG-2/N-S/2016 | Ahmedabad Metro Rail Project Phase – 1 | M/s Simplex Infrastructure Limited | 31/12/2016 |
MEGA/DDC/HIGHRISE RAIL QTERS/N-S/2015 | Tender of “Detailed Design Consultancy (DDC) services for Civil, Architectural, General Electrical and Building services including E&M works for construction of multi-storey railway quarters including one overhead water tank on north south corridor near Gandhigram railway colony on east side of Ahmedabad Metro Rail Project for Metro–link Express for Gandhinagar & Ahmedabad (MEGA) Company Ltd., vide NIT No: MEGA/DDC/HIGHRISE RAIL QTERS/N-S/2015 | Ahmedabad Metro Rail Project Phase – 1 | M/s. GOMA Engineering & Consultancy | 30/04/2016 |
MEGA/CONS/DEPOT/E-W/1/2015 | Tender of “Construction of Metro Train Depot cum Workshop at Apparel Park on East-West Corridor of Ahmedabad Metro Rail Project Phase-1, vide NIT No.: MEGA/CONS/DEPOT/E-W/1/2015 | Ahmedabad Metro Rail Project Phase – 1 | M/s. URC Construction Private Limited | 09/02/2016 |
MEGA/DDC/ELEV-STNS/E-W/R-2/2015 | Tender of “Detailed Design Consultancy Services For Civil, Architectural and Building Services including E&M works For Elevated Metro-Rail Stations – Six (6) Numbers Including Viaduct Portion Within The Station And Transition Spans On Either Side Of The Station (Thaltej, Doordarshan Kendra, Gurukul Road, Gujarat University, Commerce Six Road, Stadium) On East-West Corridor On Reach-2 (Western Reach) Of Ahmedabad Metro Rail Project For Metro–Link Express For Gandhinagar & Ahmedabad (MEGA) Company Ltd., vide NIT No.: MEGA/DDC/ELEV-STNS/E-W/R-2/2015 | Ahmedabad Metro Rail Project Phase – 1 | M/s. STUP – Aarvee Consortium | 27/01/2016 |
MEGA/CONS/VDCT/PKG-4A/N-S/2015 | Tender of “Construction of Viaduct Corridor from North End of Ranip Station to Dead End at Motera from chainage (+)12300.20 m to (+)17147.20 m (Excluding the Portions of Metro Rail Stations and transition span on both sides of Stations) on Package-4A of North-South Corridor for Ahmedabad Metro Rail Project Phase-1”, vide NIT No.: MEGA/CONS/VDCT/PKG-4A/N-S/2015 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Ranjit Buildcon Limited. | 13/01/2016 |
MEGA/CONS/VDCT+STNS/PKG-1/N-S/2015 | Inviting tenders for “Construction of Viaduct Corridor from Interface Point with Gyaspur Depot, that is, Abutment of Depot to APMC Metro Rail Station to Shreyas Metro-Rail station all inclusive of elevated Via-duct portion from chainage (-)1374.50 to (+) 3246.50 m and Elevated Metro Stations (Four Numbers) Viz. APMC, Jivraj, Rajivnagar and Shreyas for Package-1 of North-South Corridor for Ahmedabad Metro Rail Project Phase-1, vide NIT No.: MEGA/CONS/VDCT+STNS/PKG-1/N-S/2015, | Ahmedabad Metro Rail Project Phase – 1 | IL&FS Engineering & Construction Company Ltd | 11/12/2015 |
MEGA/DDC/PSTRCN/2015 | Inviting tender for “DETAILED DESIGN CONSULTANCY SERVICES FOR POWER SUPPLY & DISTRIBUTION SYSTEM, 750 V dc THIRD RAIL TRACTION ELECTRIFICATION AND SCADA SYSTEM OF AHMEDABAD METRO RAIL PROJECT FOR METRO-LINK EXPRESS FOR GANDHINAGAR & AHMEDABAD (MEGA) COMPANY LIMITED, vide NIT No.: MEGA/DDC/PSTRCN/2015 | Ahmedabad Metro Rail Project Phase – 1 | RITES – TUV SUD JV (Joint Venture of Rites Limited and TUV SUD South Asia Pvt. Ltd.) | 21/11/2015 |
MEGA/CONS/DEPOT/N-S/2/2015 | Inviting tenders for “Construction of Metro Train Depot cum Workshop at Gyaspur on North South Corridor of Ahmedabad Metro Rail Project Phase-1, | Ahmedabad Metro Rail Project Phase – 1 | GDCL – PSP – JV (Joint venture of Gannon Dunkerley & Co. Ltd & PSP Projects Pvt Ltd) | 26/10/2015 |
RFP No. MEGA/RFP/GEC/2015 and IFP No: MEGA/IFP/GEC/2014 | “Request For Proposal – Selection of General Engineering Consultant for Ahmedabad Metro Rail Project.” | Ahmedabad Metro Rail Project Phase – 1 | Consortium of SYSTRA – RITES – OCG – AECOM | 03/09/2015 |
MEGA/CONS/STNS/E-W/R-1/2015 | Inviting tenders for “Construction of Elevated Metro Rail Stations – Six (6) Numbers Including Viaduct Portion Within the Stations and Transition Spans On Either Side of the Stations (Vastral Gam, Nirant Cross Road, Vastral, Rabari Colony, Amraiwadi and Apparel Park) on Reach-1 of East-West Corridor for Ahmedabad Metro Rail Project Phase-I, vide NIT No.: MEGA/CONS/STNS/E-W/R-1/2015 | Ahmedabad Metro Rail Project Phase – 1 | M/s. DRA – CICO JV (Joint Venture of M/s. Dineshchandra R. Agrawal Infracon Pvt. Ltd, India and M/s. Chongqing International Construction Corporation, China) | 21/08/2015 |
MEGA/DDC/ELEV-STNS/N-S/2/2014 | Inviting Tender for “Detailed Design Consultancy Services for Elevated Metro-Rail Stations – Five (5) Numbers including viaduct portion within the station and transition spans on either side of the station (Motera Stadium, Sabarmati, AEC, Sabarmati Rly Station and Ranip) on North-South Corridor of Ahmedabad Metro Rail Project, vide NIT No.: MEGA/DDC/ELEV-STNS/N-S/2/2014 | Ahmedabad Metro Rail Project Phase – 1 | M/s. Aarvee Associates – KPPA JV (Joint Venture of M/s. Aarvee Associates and M/s. K.P Padmanabha Associates) | 15/06/2015 |
MEGA/CONS/DEPOT/N-S/1/2015 | Inviting tenders for “Construction of Boundary Wall, Earth Work And Land/Area-Grading Works At Gyaspur Depot On North South Corridor of Ahmedabad Metro Rail Project Phase-I, vide NIT No.: MEGA/CONS/DEPOT/N-S/1/2015 | Ahmedabad Metro Rail Project Phase – 1 | M/s. MSKEL – ACC JV (Joint Venture of M/s. M S Khurana Engineering Limited and M/s. Avadhoot Construction Co.) | 04/06/2015 |
MEGA/DDC/DEPOT/E-W/1/2014 | “Inviting Tender for Detailed Design Consultancy Services for Apparel Park Depot on East – West Corridor of Ahmedabad Metro Rail Project, vide NIT No.: MEGA/DDC/DEPOT/E-W/1/2014 | Ahmedabad Metro Rail Project Phase – 1 | M/s. RITES Limited | 02/06/2015 |
MEGA/PCC/N-S/RLY/2015 | Proof Checking Consultancy Services for proposal and drawing related to 7.37km of viaduct (approx.) and 7 Elevated Metro-Rail Stations (Including viaduct portion 0.98km) for elevated North – South Corridor in Western Railway area for Ahmedabad Metro Rail Project. | Ahmedabad Metro Rail Project Phase – 1 | M/s. RITES Limited | 09/03/2015 |
MEGA/CONS/VDCT/E-W/R-1/2014 | Construction of Elevated Viaduct from Vastral Gam To Apparel Park – up to Ramp Start in Reach R-1 (East-West Corridor). | Ahmedabad Metro Rail Project Phase – 1 | M/s. J Kumar Infraprojects Ltd. | 04/02/2015 |
MEGA/DDC/ELEV-STNS/E-W/R-2/2015 | Detailed Design Consultancy Services For Civil, Architectural and Building Services including E&M works For Elevated Metro-Rail Stations – Seven (7) Numbers Including Viaduct Portion Within The Station And Transition Spans On Either Side Of The Station (Thaltej Gam, Thaltej, Doordarshan Kendra, Gurukul Road, Gujarat University, Commerce Six Road, Stadium) On East-West Corridor On Reach-2 (Western Reach) Of Ahmedabad Metro Rail Project For Metro–Link Express For Gandhinagar & Ahmedabad (MEGA) Company Ltd. | Ahmedabad Metro Rail Project Phase – 1 | M/s. RITES Limited | 02/02/2015 |
MEGA/DDC/VDT/N-S/1 | Detailed Design Consultancy Services for Viaduct Corridor – North – South (From Interface Point with Gyaspur Depot, that is Abutment of Depot to APMC to Motera Stadium) all elevated Via-duct portions from Chainage (-)1615.000 to (+)17017.000 and Elevated Metro Station (10) Ten Numbers) viz. APMC, Jivraj, Rajivnagar, Shreyas, Paldi, Gandhigram, Old High Court (Interchange Station with Ashram Road on E-W Corridor), Usmapura, Vijay Nagar, Vadaj for METRO LINK EXPRESS FOR GANDHINAGAR & AHMEDABAD (MEGA) COMPANY LTD. | Ahmedabad Metro Rail Project Phase – 1 | M/s STUP Consultant | 18/12/2014 |
MEGA/DDC/DEPOT/N-S/1/2014 | Detailed Design Consultancy Services for Gyaspur Depot on North – South Corridor. | Ahmedabad Metro Rail Project Phase – 1 | M/s. RITES Limited | 10/12/2014 |
MEGA/DDC/VDT/E-W/1 | Detailed Design Consultancy Services for Viaduct on East – West Corridor. | Ahmedabad Metro Rail Project Phase – 1 | M/s. TCPL & Aarvee (JV) | 04/06/2014 |
MEGA/DDC/VDT/N-S/1 | Detailed Design Consultancy Services for Viaduct on North – South Corridor. | Ahmedabad Metro Rail Project Phase – 1 | M/s STUP Consultant | 29/05/2014 |