Engagement of Detailed Design Consultancy Services for Corridor-1 from Dream city Dead End (Ch: 21610.3) to Majuragate (Ch: 12313.80) Elevated Viaduct, Elevated Metro-Rail Stations – (Nine Numbers) including viaduct portion within the station and transition spans on either side of the stations & Depot at Dream city under Surat Metro Rail Project- Phase -1, hereinafter referred as “DDC Services for Surat MRTS-PH-I”
—
by