Design, Supply, Installation, Testing and Commissioning of Ballastless track from Motera to Mahatma Mandir and GNLU to GIFT City in elevated section including connecting lines to Depot along with ballasted/ ballastless / embedded standard gauge track, Ahmedabad Metro Rail Project, Phase II
—
by