Construction of 7.553 kms elevated viaduct and 7 nos. of stations (incl. E&M, Architectural Finishing, Roofing, Plumbing, Signage, etc.) from Sector-1 to Mahatma Mandir (ch. 31945.443m to 39498.302m, Package C3) in connection with Ahmedabad Metro Rail Project, Phase-2
—
by