![](https://www.gujaratmetrorail.com/wp-content/uploads/HomePageImage/tunnel.jpg)
ENGAGEMENT OF CONSULTANCY SERVICES FOR DEVELOPMENT OF MULTI MODAL INTEGRATION PLAN FOR, (I) CORRIDOR-1 FROM SARTHANA (CH: 0.0) TO DREAM CITY (CH: 20710.30 M) – TWENTY (20) STATIONS & (II) CORRIDOR-2 FROM BHESAN (CH: 0.0 M) TO SAROLI (CH: 17341.80 M) – EIGHTEEN (18) STATIONS, UNDER SURAT METRO RAIL PROJECT, PHASE – I
—
by