Detailed Design Consultancy Services for Metro Corridor from New Faisal Nagar Metro Station to Naranpura Metro Station, Elevated Viaduct (15.24km),Elevated Station(10Stations) Including Viaduct Portion within the Stations and Transition Spans on either side of the Stations(Phase-3C1) in connection with Ahmedabad Metro Rail Project, Phase -3