
NIT – Construction of 6.478km elevated viaducts and 5 stations from CH. 25467.443m to 31945.443m and 0.679 km elevated viaducts and ramp for depot entry in connection with Ahmedabad Metro Rail Project Phase – II from Motera Satdium to Mahatma Mandir (excl. E&M, architectural finishing and roofing) – Package-C2
—
by