Detailed Design Consultancy Services for Subway Environment Simulation (SES) Studies & Computational Fluid Dynamics (CFD) Analysis and Sizing of Tunnel Ventilation System and Major ECS Equipment for Entire Underground Section of SVP Airport Dead End, (Phase –2A) in connection with Ahmedabad Metro Rail Project, Phase – 2